Skip to content
Cochin Port · INCOK

Hold Cleaning Riding Crew at Cochin Port

Holds cleaned on passage, no port time spent

Get a quote

Tell us the vessel, the port and the window. Scoped reply, usually the same working day.

Or call the 24/7 desk on +91 92365 20609

Cleanship Marine embarks riding crews at Cochin Port, Kerala, to clean cargo holds on the passage out. The gang joins here, works the holds at sea and disembarks at a nominated port — the cleaning costs the vessel no port time at all.

Every other way of cleaning holds competes with something — the discharge, the berth window, the crew's own work. A riding crew competes with nothing: the work happens on a passage the vessel was making anyway. That is why it is the standard answer for tonnage leaving Cochin on a ballast leg with a clean-cargo fixture waiting at the other end, and why it is the only method whose cost does not rise when the port gets busy.

What it gets you

  • Zero port time spent on hold cleaning — the work happens on a passage already being made
  • Holds ready for inspection on arrival rather than starting the job there
  • Ship's crew kept on watchkeeping and maintenance instead of cleaning
  • One team and one standard across a multi-port voyage

Working conditions at Cochin

Work here runs both alongside and at anchorage depending on the call, and on the passage out where neither gives enough time. The south-west monsoon sets the outer limits of the calendar, roughly June to September, and it affects the anchorage far more than the berth. Access approval runs through Cochin Port Authority and the terminal, and the disposal route for residues and washings is fixed before the gang boards rather than found afterwards.

Where we work
Vallarpadam container terminal · Willingdon Island berths · Puthuvypeen terminals · Outer anchorage
Vessels we see here
Container ships · Crude and product tankers · LNG carriers · Cruise ships · Offshore support vessels

What we do at Cochin

  • Crew embarked at Cochin with tools, chemicals and PPE, cleared through the agent and the port
  • Full hold cleaning programme worked at sea, hold by hold, to the standard the next fixture requires
  • Bilge wells, strum boxes and hold bilge lines cleaned and tested on passage
  • Enclosed-space entry procedures, gas testing and safety supervision run to the vessel's own permit system
  • Disembarkation at the nominated port arranged with visas, tickets and clearances handled
  • Daily progress reporting to the vessel and the office, with a completion record on landing

Planning the window at Cochin

The south-west monsoon governs the calendar at Cochin Port, roughly June to September. Swell and reduced surface visibility close most open-water work on this coast for the duration, and the weeks either side are unreliable rather than unusable. Some vessels sit and some turn straight round, so the plan is agreed against the actual call rather than a standard package: a shore gang alongside where there is time, a riding crew on the outward passage where there is not.

Teams mobilise via Kochi (COK), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.

What we typically find at Cochin

Cochin mixes container tonnage with fertiliser and agricultural parcels, so the hold work splits two ways: cell guides, bilge wells and tank tops on the box ships, and residue removal on the bulk callers. Fertiliser is the harder of the two — hygroscopic, corrosive to coatings if left damp, and an outright failure ahead of a food-grade fixture.

Agricultural and fertiliser parcels dominate here, and they are the unforgiving residues: hygroscopic, corrosive to coatings if left damp, and an outright inspection failure ahead of a food-grade cargo. Holds shut up wet at Cochin are holds that need doing twice.

Standard scope of work

Included as standard on every riding crew hold cleaning attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.

Passage planning of the cleaning programme
The cleaning sequence is planned against the passage length, expected weather and ballast condition so every hold is completed with drying time in hand.
Complete hold preparation
Sweeping, washing, chemical treatment, rinsing and drying of all cargo holds to the agreed standard, exactly as delivered by a shore gang.
Hatch cover and coaming work
Cleaning of compression bars, drain channels and gaskets, with defects reported to the chief officer for rectification before loading.
Bilge and drainage systems
Bilge wells emptied and cleaned, strainers cleared and non-return valves tested so holds pass the water-ingress checks at inspection.
Additional deck work
Where the passage allows, the crew can extend to deck chipping, spot priming and painting under the same mobilisation.

How we deliver it at Cochin

  1. 1

    Scope and vessel details

    Tell us the vessel, her particulars, the last and next cargo and the window at Cochin. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.

  2. 2

    Approvals and waste routing

    Access and working approval is arranged with Cochin Port Authority and the terminal, and the disposal route for residues and washings is fixed before the gang boards — MARPOL Annex V compliance is a documented chain at Cochin, not an assurance. Where reception is limited, the plan changes rather than the paperwork.

  3. 3

    Mobilisation to Cochin

    Gangs, pumps, chemicals and equipment mobilise via Kochi (COK). Where a vessel is also calling at Mangalore, one mobilisation is normally sized to cover both.

  4. 4

    Entry, sequencing and the work

    Enclosed-space entry runs to the vessel's own permit system, with a fresh gas test before every entry and after every break. Gas testing, standby cover and continuous supervision run throughout, and progress is reported hold by hold rather than only at the end.

  5. 5

    Report and handover

    A completion report covering riding crew hold cleaning is issued with before-and-after imagery, hold by hold and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.

Cochin Port at a glance

UN/LOCODE
INCOK
Port type
Major Port
State
Kerala
Country
India
Water body
Arabian Sea and the Vembanad backwaters
Port authority
Cochin Port Authority
Main cargoes
Containers, Crude, POL and LNG, Fertiliser, Edible oil, Cruise
Crew mobilisation
Kochi (COK)
Services here
Hull Cleaning, Hold Cleaning and Tank Cleaning

Frequently asked — Hold Cleaning Riding Crew at Cochin

Do you provide riding crew hold cleaning at Cochin Port?

Yes. Cleanship Marine works Cochin Port (INCOK) in Kerala, India, covering the Vallarpadam container terminal, Willingdon Island berths, Puthuvypeen terminals and outer anchorage. Teams mobilise via Kochi (COK) with the full spread.

Can riding crew hold cleaning be done while the vessel works cargo at Cochin?

It depends on the call. Where the vessel has time, a shore gang works the holds alongside as they empty; where she turns straight round, a riding crew completes them on the passage. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Cochin and tell you honestly whether the window you have is enough.

How are hold washings and cargo residues disposed of at Cochin?

To MARPOL Annex V, through the reception route agreed with Cochin Port Authority and the terminal before the gang boards. Residues, sweepings and washing water are tracked from the hold to reception with documentation, so the vessel has a record rather than an assurance. Where reception capacity at Cochin is limited, we change the plan rather than the paperwork.

Where is the work done at Cochin — alongside, at anchorage or on passage?

Work here runs both alongside and at anchorage depending on the call, and on the passage out where neither gives enough time.

Which vessels do you carry out riding crew hold cleaning on at Cochin?

Container ships, Crude and product tankers, LNG carriers, Cruise ships, Offshore support vessels — the traffic at Cochin Port runs to containers, crude, pol and lng, fertiliser, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.

How quickly can a team mobilise to Cochin?

Crews and equipment mobilise via Kochi (COK). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Mangalore or Tuticorin, one mobilisation is often sized to cover both.

What does riding crew hold cleaning at Cochin cost?

It depends on the number of holds, the residue from the last cargo, the standard the next fixture demands and how much time the call at Cochin actually gives. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Cochin and you get a scoped price, usually the same working day.

Get in touch

Hold Cleaning Riding Crew at Cochin Port.