Skip to content
Offshore Services

Offshore Support Vessel Services

Charter-ready turnarounds between contracts

  • Cargo deck degreasing and non-slip surface restoration
  • Cargo, mud, brine and base oil tank cleaning
  • Void space and cofferdam entry and cleaning

Get a quote

Tell us the vessel, the port and the window. Scoped reply, usually the same working day.

Or call the 24/7 desk on +91 92365 20609

The window between one charter ending and the next beginning is where support vessels earn or lose their next contract. Deck areas need degreasing, cargo tanks need cleaning to the incoming charterer's specification, voids need inspection, and accommodation needs a standard of presentation that survives an operator's audit.

We put a single team on all of it, so the vessel goes from off-charter to inspection-ready without coordinating four separate contractors across a two-day window.

What you get

  • Cargo deck degreasing and non-slip surface restoration
  • Cargo, mud, brine and base oil tank cleaning
  • Void space and cofferdam entry and cleaning
  • Accommodation deep cleaning to audit standard
  • Surface preparation and touch-up coating

Scope of work

What is included as standard. Anything outside this is quoted separately and flagged before mobilisation, never added afterwards.

  1. 01

    Cargo deck cleaning

    Degreasing, hydroblasting and residue removal across working deck areas, cargo rails and pipe stacks.

  2. 02

    Tank and void cleaning

    Cargo, mud, brine and drill water tanks cleaned, plus void spaces and cofferdams entered and cleaned for survey.

  3. 03

    Accommodation and galley

    Deep cleaning of accommodation, galley and messing areas to the standard operator audits require.

  4. 04

    Surface preparation and coating

    Rust spotting, mechanical preparation and touch-up coating on deck areas, structures and handrails.

  5. 05

    Charter handover support

    Attendance at on-hire and off-hire inspections with rectification carried out on the spot.

How we deliver it

  1. 01

    Scope agreement

    Work list agreed against the charter turnaround window and the incoming charterer's acceptance criteria.

  2. 02

    Mobilisation

    Team and equipment mobilised to the quay or supply base within the vessel's window.

  3. 03

    Execution

    Work runs in parallel across deck, tanks and accommodation to compress the total duration.

  4. 04

    Inspection

    Vessel presented for on-hire inspection with any observations rectified immediately.

Frequently asked

How fast can a turnaround be completed?

It depends entirely on the work list, but running deck, tank and accommodation scopes in parallel with one contractor typically compresses a turnaround substantially against coordinating separate trades. We will give you a realistic duration against your actual scope.

Get in touch

We always ready to serve you.

Tell us the vessel, the port and the window. You get a scope, a crew size and an honest duration — usually the same working day.