By Capt. Neeraj Bharti, Founder, Master Mariner · Published · 2 min read
Cleaning on the ballast passage: how riding crews handle changeovers at sea

The cheapest time to clean a tanker is time the ship is spending anyway. A ballast passage between a dirty discharge and a clean load port can be several days long, and a riding squad can turn those days into a completed changeover, so the ship arrives ready for inspection instead of cleaning at anchor on hire.
What a riding squad does
A riding squad is a team of tank cleaning specialists who join the ship, usually at the discharge port or a convenient port on the route, work during the passage and leave at or before the load port. On a changeover they typically:
- Run or support the machine washing programme, including hot washing
- Flush and drain lines, pumps and heating coils
- Hand-hose shadow areas, suction wells and coils
- Carry out demucking where sediment has built up
- Strip, mop and dry tanks
- Pre-inspect every tank and the cargo system before arrival
The ship's crew keeps running the ship; the squad does the cleaning.
What the ship needs to provide
- Accommodation and food for the team
- Lifesaving capacity for the extra people
- Heat for hot washing, and fresh water for the final rinse
- Power and air for portable equipment
- Permits and supervision under the ship's safety management system
- Slop capacity and a plan for where slops go
Weather, slops and safety
Weather. Heavy rolling stops manual work in tanks and can make machine washing less effective. Plan for some lost time on longer passages.
Slops. Washing at sea produces slops that must be retained, decanted and discharged in line with MARPOL Annex I, or landed to reception facilities. Slop tank capacity can become the limit on how much washing is possible.
Safety. Every entry needs gas-freeing, atmosphere testing for oxygen, hydrocarbons and toxic gases such as hydrogen sulphide and benzene where relevant, a permit and a rescue plan. Entry after black oil is covered in its own article in this series.
When a riding squad makes sense
- The passage is long enough to complete the work
- The crew is too small or too busy to do it alone
- The next grade is sensitive and the standard is high
- Port time for cleaning would be expensive or unavailable
For short passages, a shore gang at the load port or anchorage, or a combination, may work better. See the DPP to CPP changeover guide and how long a changeover takes.
How Cleanship helps
Our riding squads join tankers at ports in the UAE and India and work changeovers on passage, with planning, manual finishing, drying and a pre-inspection before arrival. See our DPP and CPP tank cleaning service or send us the voyage plan.
Sources & further reading
Frequently asked questions
What is a riding squad for tank cleaning?
A team of tank cleaning specialists who join a tanker, carry out washing, manual finishing, drying and pre-inspection during the voyage, and leave at or before the load port.
Can a full DPP to CPP changeover be done at sea?
Often yes, if the passage is long enough, heat and slop capacity are available, the weather allows manual work, and safety procedures are followed.
What does the ship need to provide for a riding squad?
Accommodation, food, lifesaving capacity, heat and fresh water, power and air, permits and supervision under the safety management system, and slop capacity.
What limits cleaning at sea?
Weather, slop tank capacity, available heat and fresh water, and the length of the passage.
- riding crew tank cleaning
- riding squad tanker
- tank cleaning at sea
- changeover ballast passage
- tanker cleaning on passage
Related articles
- Tank cleaningHow long does a DPP to CPP changeover take? What drives the timelineThe factors that decide how long a dirty-to-clean changeover takes on a product tanker, and how to shorten it with planning, heat, people and parallel work.
- Tank cleaningBefore you fix a clean cargo: the DPP to CPP changeover checklist for operatorsA pre-fixture checklist for operators considering a clean cargo on a ship coming out of dirty trades: cargo history, specification, coating, time, team, slops and inspection standard.
- Tank cleaningEnd-of-life tank coating: why it holds black oil and how to plan around itWhy cargo tank coatings near the end of their life absorb and hold dark cargo, how that affects a DPP to CPP changeover, and how to assess coating before fixing a sensitive clean cargo.
- Tank cleaningJet A-1 after dirty cargo: how charterers judge previous cargoesWhy jet fuel is the most demanding clean cargo after a DPP history, how charterers look at previous cargoes, and what tank preparation it takes to load Jet A-1 without contamination claims.