Skip to content
Puttalam Port · LKPTL

Hold Cleaning Riding Crew at Puttalam Port

Holds cleaned on passage, no port time spent

Get a quote

Tell us the vessel, the port and the window. Scoped reply, usually the same working day.

Or call the 24/7 desk on +91 92365 20609

Cleanship Marine embarks riding crews at Puttalam Port, North Western Province, to clean cargo holds on the passage out. The gang joins here, works the holds at sea and disembarks at a nominated port — the cleaning costs the vessel no port time at all.

Every other way of cleaning holds competes with something — the discharge, the berth window, the crew's own work. A riding crew competes with nothing: the work happens on a passage the vessel was making anyway. That is why it is the standard answer for tonnage leaving Puttalam on a ballast leg with a clean-cargo fixture waiting at the other end, and why it is the only method whose cost does not rise when the port gets busy.

What it gets you

  • Zero port time spent on hold cleaning — the work happens on a passage already being made
  • Holds ready for inspection on arrival rather than starting the job there
  • Ship's crew kept on watchkeeping and maintenance instead of cleaning
  • One team and one standard across a multi-port voyage

Working conditions at Puttalam

Work here runs both alongside and at anchorage depending on the call, and on the passage out where neither gives enough time. The two monsoons sets the outer limits of the calendar, the south-west from May to September and the north-east from December to February, and it affects the anchorage far more than the berth. Humidity is high year-round rather than seasonal, so enclosed-space work here is planned with ventilation and rest cycles in every month, not just the summer. Access approval runs through Sri Lanka Ports Authority and the terminal, and the disposal route for residues and washings is fixed before the gang boards rather than found afterwards.

Where we work
Cement jetty · Lagoon anchorage · Lightering position
Vessels we see here
Handysize bulk carriers · Barges and coastal craft

What we do at Puttalam

  • Crew embarked at Puttalam with tools, chemicals and PPE, cleared through the agent and the port
  • Full hold cleaning programme worked at sea, hold by hold, to the standard the next fixture requires
  • Bilge wells, strum boxes and hold bilge lines cleaned and tested on passage
  • Enclosed-space entry procedures, gas testing and safety supervision run to the vessel's own permit system
  • Disembarkation at the nominated port arranged with visas, tickets and clearances handled
  • Daily progress reporting to the vessel and the office, with a completion record on landing

Planning the window at Puttalam

The two monsoons governs the calendar at Puttalam Port, the south-west from May to September and the north-east from December to February. For hold work the wind matters less than the rain: holds cannot be washed, dried and closed in wet weather, and a hold shut up damp fails inspection however clean it looks. Some vessels sit and some turn straight round, so the plan is agreed against the actual call rather than a standard package: a shore gang alongside where there is time, a riding crew on the outward passage where there is not.

Teams mobilise via Colombo (CMB), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.

What we typically find at Puttalam

Puttalam Port runs cement and clinker, limestone, coal through the same holds, and that sequence is where the money is lost: mineral fines and dust from one fixture will fail an inspection for the next if the holds are only swept. The standard that matters is the one the next cargo demands, not the one the last one left.

The condition we find here varies more than at most ports, because some vessels have had days at anchor to work the holds and some have had none. The scope is confirmed on boarding rather than assumed from the fixture.

Standard scope of work

Included as standard on every riding crew hold cleaning attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.

Passage planning of the cleaning programme
The cleaning sequence is planned against the passage length, expected weather and ballast condition so every hold is completed with drying time in hand.
Complete hold preparation
Sweeping, washing, chemical treatment, rinsing and drying of all cargo holds to the agreed standard, exactly as delivered by a shore gang.
Hatch cover and coaming work
Cleaning of compression bars, drain channels and gaskets, with defects reported to the chief officer for rectification before loading.
Bilge and drainage systems
Bilge wells emptied and cleaned, strainers cleared and non-return valves tested so holds pass the water-ingress checks at inspection.
Additional deck work
Where the passage allows, the crew can extend to deck chipping, spot priming and painting under the same mobilisation.

How we deliver it at Puttalam

  1. 1

    Scope and vessel details

    Tell us the vessel, her particulars, the last and next cargo and the window at Puttalam. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.

  2. 2

    Approvals and waste routing

    Sri Lanka Ports Authority approves the work alongside the local harbour master, and at a state port that conversation is quicker but less formal — it is worth having in writing. The disposal route for residues and washings is fixed before the gang boards — MARPOL Annex V compliance is a documented chain, not an assurance. Where reception at Puttalam is limited, the plan changes rather than the paperwork.

  3. 3

    Mobilisation to Puttalam

    Gangs, pumps, chemicals and equipment mobilise via Colombo (CMB). Where a vessel is also calling at Colombo, one mobilisation is normally sized to cover both.

  4. 4

    Entry, sequencing and the work

    Enclosed-space entry runs to the vessel's own permit system, with a fresh gas test before every entry and after every break. Gas testing, standby cover and continuous supervision run throughout, and progress is reported hold by hold rather than only at the end.

  5. 5

    Report and handover

    A completion report covering riding crew hold cleaning is issued with before-and-after imagery, hold by hold and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.

Puttalam Port at a glance

UN/LOCODE
LKPTL
Port type
State Port
State
North Western Province
Country
Sri Lanka
Water body
Puttalam Lagoon
Port authority
Sri Lanka Ports Authority
Main cargoes
Cement and clinker, Limestone, Coal, Salt, General cargo
Crew mobilisation
Colombo (CMB)
Services here
Hull Cleaning and Hold Cleaning

Frequently asked — Hold Cleaning Riding Crew at Puttalam

Do you provide riding crew hold cleaning at Puttalam Port?

Yes. Cleanship Marine works Puttalam Port (LKPTL) in North Western Province, Sri Lanka, covering the cement jetty, lagoon anchorage and lightering position. Teams mobilise via Colombo (CMB) with the full spread.

Can riding crew hold cleaning be done while the vessel works cargo at Puttalam?

It depends on the call. Where the vessel has time, a shore gang works the holds alongside as they empty; where she turns straight round, a riding crew completes them on the passage. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Puttalam and tell you honestly whether the window you have is enough.

How are hold washings and cargo residues disposed of at Puttalam?

To MARPOL Annex V, through the reception route agreed with Sri Lanka Ports Authority and the terminal before the gang boards. Residues, sweepings and washing water are tracked from the hold to reception with documentation, so the vessel has a record rather than an assurance. Where reception capacity at Puttalam is limited, we change the plan rather than the paperwork.

Where is the work done at Puttalam — alongside, at anchorage or on passage?

Work here runs both alongside and at anchorage depending on the call, and on the passage out where neither gives enough time. Between June and September the binding constraint is working temperature inside the space rather than access to it.

Which vessels do you carry out riding crew hold cleaning on at Puttalam?

Handysize bulk carriers, Barges and coastal craft — the traffic at Puttalam Port runs to cement and clinker, limestone, coal, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.

How quickly can a team mobilise to Puttalam?

Crews and equipment mobilise via Colombo (CMB). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Colombo or Trincomalee, one mobilisation is often sized to cover both.

What does riding crew hold cleaning at Puttalam cost?

It depends on the number of holds, the residue from the last cargo, the standard the next fixture demands and how much time the call at Puttalam actually gives. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Puttalam and you get a scoped price, usually the same working day.

Get in touch

Hold Cleaning Riding Crew at Puttalam Port.

Tell us the vessel, her ETA at Puttalam and the window. You get a scope, a crew size and an honest duration — usually the same working day.