Offshore Vessel Tank Cleaning at Mundra Port

Mud, brine and base oil tanks turned round between charters

Get a quote

Tell us the vessel, the port and the window. Scoped reply, usually the same working day.

Or call the 24/7 desk on +91 92365 20609

Cleanship Marine cleans offshore support vessel tanks at Mundra Port, Gujarat — drilling mud, brine, base oil, cement and bulk tanks turned round between charters and prepared for the next product.

An OSV between charters is an asset earning nothing, and the tank turnaround is usually the item on the critical path. The products involved — mud, brine, base oil, cement — each leave a different residue and need a different method, so the plan is built product by product rather than tank by tank.

What it gets you

  • Vessel handed to the next charter on time rather than held on the tank turnaround
  • Cross-contamination between products avoided
  • Inspection passed at the first attempt
  • Disposal documented, not improvised

Working conditions at Mundra

Work here starts alongside, and where the berth window runs out it continues on the outward passage with a riding crew — the berth will not be held open for it. The south-west monsoon sets the outer limits of the calendar, roughly June to September, and it affects the anchorage far more than the berth. Approval runs through Mundra Port and the Gujarat Maritime Board and the terminal operator, and licensed slop reception is booked before the tanks are opened — at most ports on this list that booking, not the cleaning, is what sets the date.

Where we work
Container terminals · Bulk and coal berths · Liquid terminals · Outer anchorage
Vessels we see here
Large container ships · Capesize and Panamax bulk carriers · Crude and product tankers

What we do at Mundra

  • Product-specific cleaning plan for mud, brine, base oil, cement and bulk tanks
  • Gas-freeing, atmosphere testing and enclosed-space entry certification
  • Manual and mechanical cleaning of tanks, lines, valves and pump rooms
  • Preparation and presentation for the incoming charterer's inspection
  • Residue and washings disposed of through licensed reception at Mundra
  • Tank-by-tank completion record for the vessel and the charterer

Planning the window at Mundra

The south-west monsoon governs the calendar at Mundra Port, roughly June to September. Swell and reduced surface visibility close most open-water work on this coast for the duration, and the weeks either side are unreliable rather than unusable. Terminal windows here are tight and most operators will not permit tank work alongside, so the realistic plan is the anchorage or the outward passage. That is agreed before the vessel arrives, not argued at the berth.

Teams mobilise via Mundra or Bhuj (BHJ), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.

What we typically find at Mundra

Mundra handles crude and product parcels on tight terminal windows, so tank work is planned as a passage or anchorage job unless the terminal has explicitly approved it alongside.

Edible oil parcels move through Mundra Port, and those are the strictest specifications in the trade. Prior-cargo restrictions and wall-wash results set the standard, not the visual condition, and a tank that looks clean can still fail on analysis.

Standard scope of work

Included as standard on every offshore vessel tank cleaning attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.

Fluid recovery and stripping
Residual mud, brine and base oil are recovered and transferred to nominated tanks, road tankers or shore reception.
Tank washing
Machine and manual washing appropriate to the fluid type, with particular attention to settled solids in mud and cement tanks.
Line and pump flushing
Associated pipework, pumps and manifolds are flushed so cross-contamination does not reappear from the system after the tank is clean.
Survey preparation
Tanks are cleaned and dried to a condition suitable for coating inspection and class survey attendance.
Waste management
Recovered fluids and solids are consolidated and landed to licensed facilities with manifests issued.

How we deliver it at Mundra

  1. 1

    Scope and vessel details

    Tell us the vessel, her particulars, the prior and next grade and the window at Mundra. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.

  2. 2

    Approvals, slops and certification

    Terminal and port approval for tank work is obtained from Mundra Port and the Gujarat Maritime Board and the terminal operator, licensed slop and sludge reception is booked, and marine chemist attendance is arranged where the grade change requires it. At Mundra the disposal route is the item that most often sets the schedule, so it is fixed first.

  3. 3

    Mobilisation to Mundra

    Crews, pumps, machines and chemicals mobilise via Mundra or Bhuj (BHJ). Where a vessel is also calling at Kandla, one mobilisation is normally sized to cover both.

  4. 4

    Gas-freeing, entry and cleaning

    Atmosphere testing, gas-freeing and enclosed-space entry certification come before any entry, and are repeated after every break. Standby cover and atmosphere monitoring run continuously while anyone is inside, and progress is reported tank by tank.

  5. 5

    Report and handover

    A completion report covering offshore vessel tank cleaning is issued with before-and-after imagery, tank by tank and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.

Mundra Port at a glance

UN/LOCODE
INMUN
Port type
Private Port
State
Gujarat
Country
India
Water body
Gulf of Kutch
Port authority
Mundra Port and the Gujarat Maritime Board
Main cargoes
Containers, Thermal coal, Crude and POL, Fertiliser, Edible oil, Project cargo
Crew mobilisation
Mundra / Bhuj (BHJ) / Kandla (IXY)
Services here
Hull Cleaning, Hold Cleaning and Tank Cleaning

Frequently asked — OSV Tank Cleaning at Mundra

Do you provide offshore vessel tank cleaning at Mundra Port?

Yes. Cleanship Marine works Mundra Port (INMUN) in Gujarat, India, covering the container terminals, bulk and coal berths, liquid terminals, outer anchorage. Teams mobilise via Mundra or Bhuj (BHJ) with the full spread.

Can offshore vessel tank cleaning be done while the vessel works cargo at Mundra?

Most terminals here will not permit tank work alongside, so the plan is the anchorage or the outward passage. We confirm the terminal's position before quoting rather than discovering it at the gangway. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Mundra and tell you honestly whether the window you have is enough.

How is slop and sludge disposal handled at Mundra?

Through licensed reception, booked with Mundra Port and the Gujarat Maritime Board and the terminal operator before the tanks are opened. At Mundra the disposal route is usually what sets the schedule, so it is fixed first and documented tank by tank. Gas-freeing, atmosphere testing and enclosed-space entry certification are part of the same scope.

Where is the work done at Mundra — alongside, at anchorage or on passage?

Work here starts alongside, and where the berth window runs out it continues on the outward passage with a riding crew — the berth will not be held open for it.

Which vessels do you carry out offshore vessel tank cleaning on at Mundra?

Large container ships, Capesize and Panamax bulk carriers, Crude and product tankers — the traffic at Mundra Port runs to containers, thermal coal, crude and pol, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.

How quickly can a team mobilise to Mundra?

Crews and equipment mobilise via Mundra or Bhuj (BHJ). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Kandla, one mobilisation is often sized to cover both.

What does offshore vessel tank cleaning at Mundra cost?

It depends on the tank count and volume, the prior and next grade, how much sludge is in there and whether the work runs alongside, at anchorage or on passage from Mundra. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Mundra and you get a scoped price, usually the same working day.

Get in touch

Offshore Vessel Tank Cleaning at Mundra Port.

Tell us the vessel, her ETA at Mundra and the window. You get a scope, a crew size and an honest duration — usually the same working day.