Tank Cleaning at Ennore Port
Grade changes, sludge removal and shore tanks at Ennore Port — coal and car carrier traffic north of Chennai.
Get a quote
Tell us the vessel, the port and the window. Scoped reply, usually the same working day.
Cleanship Marine cleans cargo, bunker and shore tanks at Ennore Port (INENR), Tamil Nadu — grade changes on product and chemical tankers, sludge demucking, terminal storage tanks and offshore support vessel turnarounds. Ennore handles LNG and product parcels, and the terminals set their own conditions for tank work alongside. Where the berth will not carry it the work moves to the anchorage or the outward passage, and the slop reception is booked either way rather than assumed.
Working conditions at Ennore
Work here starts alongside, and where the berth window runs out it continues on the outward passage with a riding crew — the berth will not be held open for it. The north-east monsoon sets the outer limits of the calendar, roughly October to December, and it affects the anchorage far more than the berth. Approval runs through Kamarajar Port Limited and the terminal operator, and licensed slop reception is booked before the tanks are opened — at most ports on this list that booking, not the cleaning, is what sets the date.
- Where we work
- Coal berths · RoRo berths · Liquid terminals · Anchorage
- Vessels we see here
- Bulk carriers · Pure car and truck carriers · LNG carriers · Product tankers
Tank Cleaning scopes at Ennore
4 scopes, one team and one mobilisation. Most vessels calling here take more than one on the same attendance.
Tanker Tank Cleaning at Ennore
Grade change delivered to the surveyor's standard
ViewTank Demucking at Ennore
Sludge out, capacity back
ViewShore Tank Cleaning at Ennore
Terminal tanks returned to service, safely certified
ViewOSV Tank Cleaning at Ennore
Mud, brine and base oil tanks turned round between charters
View
Planning the window at Ennore
The north-east monsoon governs the calendar at Ennore Port, roughly October to December. For tank work it is the anchorage that suffers — where the terminal will not permit work alongside, weather that closes the anchorage closes the job. Terminal windows here are tight and most operators will not permit tank work alongside, so the realistic plan is the anchorage or the outward passage. That is agreed before the vessel arrives, not argued at the berth.
Teams mobilise via Chennai (MAA), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.
What we typically find at Ennore
Gas and specialised liquid tonnage calls here, which puts the certification chain ahead of the cleaning itself: gas-freeing, marine chemist attendance and enclosed-space entry certificates are the critical path, and the physical work is the short part of the job.
Tanks here are usually presented with a machine wash already done and the hand work outstanding — bottom structure, suction wells, heating coils and the areas the machines cannot reach. That remainder is what a wall wash actually fails on.
How we deliver it at Ennore
- 1
Scope and vessel details
Tell us the vessel, her particulars, the prior and next grade and the window at Ennore. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.
- 2
Approvals, slops and certification
Kamarajar Port Limited runs a statutory permit process here, so the lead time is real and the application goes in early rather than on arrival. Licensed slop and sludge reception is booked and marine chemist attendance arranged where the grade change requires it. At Ennore the disposal route is the item that most often sets the schedule, so it is fixed first.
- 3
Mobilisation to Ennore
Crews, pumps, machines and chemicals mobilise via Chennai (MAA). Where a vessel is also calling at Chennai, one mobilisation is normally sized to cover both.
- 4
Gas-freeing, entry and cleaning
Atmosphere testing, gas-freeing and enclosed-space entry certification come before any entry, and are repeated after every break. Standby cover and atmosphere monitoring run continuously while anyone is inside, and progress is reported tank by tank.
- 5
Report and handover
A completion report covering tank cleaning is issued with before-and-after imagery, tank by tank and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.
Ennore Port at a glance
- UN/LOCODE
- INENR
- Port type
- Major Port
- State
- Tamil Nadu
- Country
- India
- Water body
- Bay of Bengal
- Port authority
- Kamarajar Port Limited
- Main cargoes
- Thermal coal, Automobiles and RoRo, LNG, POL, General cargo
- Crew mobilisation
- Chennai (MAA)
- Services here
- Hull Cleaning, Hold Cleaning and Tank Cleaning
Frequently asked — Ennore Port
Does Cleanship provide tank cleaning at Ennore Port?
Yes. We cover the full tank cleaning scope at Ennore Port (INENR), Tamil Nadu — tanker tank cleaning — DPP & CPP, tank demucking, shore tank cleaning and offshore vessel tank cleaning. Teams mobilise via Chennai (MAA).
Where is the work done at Ennore — alongside, at anchorage or on passage?
Work here starts alongside, and where the berth window runs out it continues on the outward passage with a riding crew — the berth will not be held open for it.
Who approves tank cleaning work at Ennore?
Kamarajar Port Limited issues the port-side approval at Ennore Port, with terminal approval on top where the berth requires it. We arrange both, along with the waste reception and disposal route, so it does not fall to the agent or the master.
Which vessels call at Ennore?
Bulk carriers, Pure car and truck carriers, LNG carriers, Product tankers — Ennore Port is coal and car carrier traffic north of Chennai, handling thermal coal, automobiles and RoRo, LNG, POL, general cargo. What sizes a tank job is the tank count, the prior and next grade and how much sludge is carried, not the vessel's dimensions.
Can this be done without taking the vessel off hire at Ennore?
Yes — that is the point of it. Every scope listed here is carried out with the vessel afloat and working, at the berth, at the anchorage or on the passage out. Tank work runs alongside where the terminal permits it, and otherwise at anchorage or on the passage out — none of which takes the vessel off hire.
Do you cover other ports near Ennore?
Yes. Krishnapatnam and Kakinada all sit within the same operating range for tank cleaning, and a single mobilisation is often sized to cover more than one vessel on the same trip. We work 32 ports on the coverage list for this line.
Tank Cleaning at Ennore Port.
Tell us the vessel, her ETA at Ennore and the window. You get a scope, a crew size and an honest duration — usually the same working day.


