Cleanship Marine removes accumulated sludge, scale and sediment from cargo and bunker tanks at Magdalla Port, Gujarat — the manual, enclosed-space work that washing alone will not do.
Sludge is a slow loss: it takes cargo capacity, it fouls heating coils and suctions, and it turns every subsequent tank clean into a longer job. Disposal is the part that actually governs the schedule here — the muck has to go somewhere licensed, and that is arranged before the tanks are opened.
What it gets you
- Cargo and bunker capacity recovered rather than carried as dead weight
- Heating coils and suctions cleared, restoring discharge performance
- Disposal documented through licensed reception
- Tank structure inspected while it is open and empty
Working conditions at Magdalla
Work here runs both alongside and at anchorage depending on the call, and on the passage out where neither gives enough time. The south-west monsoon sets the outer limits of the calendar, roughly June to September, and it affects the anchorage far more than the berth. Approval runs through Gujarat Maritime Board and the terminal operator, and licensed slop reception is booked before the tanks are opened — at most ports on this list that booking, not the cleaning, is what sets the date.
- Where we work
- River jetties · Outer anchorage
- Vessels we see here
- Handysize bulk carriers · General cargo ships · Coastal tankers
What we do at Magdalla
- Atmosphere testing, gas-freeing and enclosed-space entry certification before entry
- Manual removal of sludge, scale and sediment from tank bottoms, frames and structure
- Heating coils, suction wells and bell mouths cleared and confirmed
- Material bagged, transferred and tracked from tank to reception
- Disposal through licensed reception facilities at Magdalla with the paperwork to prove it
- Tank condition photographed and reported, including anything found under the sludge
Planning the window at Magdalla
The south-west monsoon governs the calendar at Magdalla Port, roughly June to September. Swell and reduced surface visibility close most open-water work on this coast for the duration, and the weeks either side are unreliable rather than unusable. Whether the work runs alongside, at anchorage or on passage depends on the terminal and the grade, so the plan is built against the actual call. Where a terminal will not permit tank work at the berth, we say so at quoting stage rather than after mobilisation.
Teams mobilise via Surat (STV) or Vadodara (BDQ), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.
What we typically find at Magdalla
Tank work at Magdalla is coastal product and edible oil tonnage on short regional voyages, so the cycle is fast and the grade changes frequent. The river berths are depth-limited, so the tanks are smaller — which makes hand work a larger share of the total than machine washing.
Edible oil parcels move through Magdalla Port, and those are the strictest specifications in the trade. Prior-cargo restrictions and wall-wash results set the standard, not the visual condition, and a tank that looks clean can still fail on analysis.
Standard scope of work
Included as standard on every tank demucking attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.
- Tank entry preparation
- Ventilation, gas testing, lighting, access rigging and rescue arrangements are established before any entry is authorised.
- Manual residue removal
- Sludge, wax and scale are removed by hand from tank bottoms, suction wells, bellmouths, heating coils and structural pockets.
- Vacuum and pump-out
- Pumpable residues are recovered by vacuum unit or portable pump directly to slop tanks, road tankers or barges.
- Scale and hard deposit removal
- Adhered rust scale and hardened deposits are removed by scraping, chipping or hydroblasting where the coating system permits.
- Waste handling and documentation
- Recovered material is quantified, transferred to licensed reception facilities and documented with manifests for the vessel's MARPOL records.
How we deliver it at Magdalla
- 1
Scope and vessel details
Tell us the vessel, her particulars, the prior and next grade and the window at Magdalla. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.
- 2
Approvals, slops and certification
Terminal and port approval for tank work is obtained from Gujarat Maritime Board and the terminal operator, licensed slop and sludge reception is booked, and marine chemist attendance is arranged where the grade change requires it. At Magdalla the disposal route is the item that most often sets the schedule, so it is fixed first.
- 3
Mobilisation to Magdalla
Crews, pumps, machines and chemicals mobilise via Surat (STV) or Vadodara (BDQ). Where a vessel is also calling at Hazira, one mobilisation is normally sized to cover both.
- 4
Gas-freeing, entry and cleaning
Atmosphere testing, gas-freeing and enclosed-space entry certification come before any entry, and are repeated after every break. Standby cover and atmosphere monitoring run continuously while anyone is inside, and progress is reported tank by tank.
- 5
Report and handover
A completion report covering tank demucking is issued with before-and-after imagery, tank by tank and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.
Magdalla Port at a glance
- UN/LOCODE
- INMDA
- Port type
- State Port
- State
- Gujarat
- Country
- India
- Water body
- Tapi estuary, Gulf of Khambhat
- Port authority
- Gujarat Maritime Board
- Main cargoes
- Coal, Steel and scrap, Timber, Edible oil, General cargo
- Crew mobilisation
- Surat (STV) / Vadodara (BDQ)
- Services here
- Hull Cleaning, Hold Cleaning and Tank Cleaning
Frequently asked — Tank Demucking at Magdalla
Do you provide tank demucking at Magdalla Port?
Yes. Cleanship Marine works Magdalla Port (INMDA) in Gujarat, India, covering the river jetties and outer anchorage. Teams mobilise via Surat (STV) or Vadodara (BDQ) with the full spread.
Can tank demucking be done while the vessel works cargo at Magdalla?
It depends on the terminal and the grade. Some berths here permit tank work alongside and some do not; we establish which before the vessel arrives and plan for the anchorage or the passage where the answer is no. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Magdalla and tell you honestly whether the window you have is enough.
How is slop and sludge disposal handled at Magdalla?
Through licensed reception, booked with Gujarat Maritime Board and the terminal operator before the tanks are opened. At Magdalla the disposal route is usually what sets the schedule, so it is fixed first and documented tank by tank. Gas-freeing, atmosphere testing and enclosed-space entry certification are part of the same scope.
Where is the work done at Magdalla — alongside, at anchorage or on passage?
Work here runs both alongside and at anchorage depending on the call, and on the passage out where neither gives enough time.
Which vessels do you carry out tank demucking on at Magdalla?
Handysize bulk carriers, General cargo ships and Coastal tankers — the traffic at Magdalla Port runs to coal, steel and scrap, timber, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.
How quickly can a team mobilise to Magdalla?
Crews and equipment mobilise via Surat (STV) or Vadodara (BDQ). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Hazira or Dahej, one mobilisation is often sized to cover both.
What does tank demucking at Magdalla cost?
It depends on the tank count and volume, the prior and next grade, how much sludge is in there and whether the work runs alongside, at anchorage or on passage from Magdalla. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Magdalla and you get a scoped price, usually the same working day.
Tank Demucking at Magdalla Port.
Tell us the vessel, her ETA at Magdalla and the window. You get a scope, a crew size and an honest duration — usually the same working day.