Underwater Hull Cleaning at Gambia River Terminals
Full hull cleaned in the water, vessel stays on hire
Get a quote
Tell us the vessel, the port and the window. Scoped reply, usually the same working day.
Cleanship Marine provides underwater hull cleaning at Gambia River Terminals, Banjul, working the inner anchorage off Banjul and Mandinari conventional buoy mooring. Commercial dive teams remove slime, weed and shell growth from the vertical sides, flat bottom, bilge keels, sea chests and niche areas with the vessel afloat and on hire — no dry dock, no diversion, no off-hire.
This is the part of the Port of Banjul where the big ships wait and where the fuel comes in. The inner anchorage holds vessels waiting for a berth at Banjul and tankers too deep for the oil berth, and the Mandinari buoy mooring handles tanker discharge for the country's fuel supply. For most tankers calling The Gambia, the anchorage and Mandinari — not the quays — are where they spend their time.
Most tankers bringing fuel to The Gambia cannot use the port's oil berth, which has only 5 to 6 metres of water, so they spend their call at the inner anchorage or on the Mandinari buoys. The time at anchor waiting for the buoys is the window for a hull clean, done at slack water in the estuary's tidal stream. Nothing is done while the tanker is moored at Mandinari and discharging.
What it gets you
- Hydrodynamic smoothness restored before fouling reaches the calcareous stage that damages coating
- Fuel and emissions penalty from drag reduced without taking the vessel off hire
- Documented condition record for the technical file and the next docking specification
- Sea chests and inlets cleared, protecting cooling water flow
Working conditions at Gambia River
The inner anchorage off Banjul is 14 to 15 metres deep, a wide stretch of the estuary about a mile across and two miles long — far deeper than the port's own oil berth, which has only 5 to 6 metres. So the larger tankers bringing fuel to The Gambia either lie at anchor or moor at the conventional buoy mooring at Mandinari, about four nautical miles south of the commercial port, where they are held fore and aft between buoys. It is all tidal estuary water: the stream runs hard on the ebb and flood, and visibility is low.
- Where we work
- Inner anchorage off Banjul · Mandinari conventional buoy mooring · Outer anchorage beyond the bar
- Vessels we see here
- Product tankers · Vessels waiting for a Banjul berth · Lightering and bunker barges
What we do at Gambia River
- Pre-clean fouling survey to establish coverage, growth type and coating condition before any tool touches the hull
- Brush cart cleaning of the flat bottom and vertical sides, with brush hardness selected against your antifouling specification
- Hand cleaning of bilge keels, rudder, stern frame, thruster tunnels, anodes and the niches a cart cannot follow
- Sea chest gratings and inlet openings cleared of growth and debris to restore cooling water flow
- Diving permission cleared with Gambia Ports Authority and the terminal before mobilisation
- Before-and-after video and stills, with a written report on coating condition and anode wastage
Planning the window at Gambia River
The combination of Atlantic swell and rain governs the calendar at Gambia River Terminals, with the heaviest rain from May to October and swell running year-round. The swell here is long-period Atlantic ground swell rather than wind-driven sea, so it reaches the anchorages on days that look calm from the bridge and it is the single biggest cause of a lost in-water window on this coast. The tidal stream in the estuary sets the method here: dives are timed to slack water at the anchorage, the team works by touch under surface supervision in low visibility, and nothing is done at the Mandinari buoys while a tanker is moored and discharging.
Work is taken at the inner anchorage off Banjul, Mandinari conventional buoy mooring and outer anchorage beyond the bar, and which of those a vessel ends up at changes the dive plan more than the season does. Teams mobilise via Banjul (BJL), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.
What we typically find at Gambia River
The working fleet here spends most of its life at low speed in warm water, so growth is heavy, mixed and reaches the hard calcareous stage sooner than on deep-sea tonnage. Left too long it starts damaging the coating rather than just slowing the vessel.
Vessels at the Banjul anchorage are waiting, often for days, in warm, nutrient-rich estuary water — ideal conditions for growth. Tankers waiting for Mandinari or for lighterage collect fouling across the flat bottom, and the sea chests pick up both growth and river silt.
Standard scope of work
Included as standard on every underwater hull cleaning attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.
- Fouling survey
- A pre-clean dive establishes fouling type, coverage and severity, and confirms coating condition so the correct tooling is selected.
- Flat bottom and vertical sides
- Brush cart cleaning of large areas, removing slime, weed and shell growth to restore surface smoothness.
- Niche areas
- Hand cleaning of bilge keels, bow thruster tunnels, rudder, stern frame, anodes and other niche areas where fouling concentrates.
- Sea chests and gratings
- Sea chest gratings and inlet openings cleared of growth and debris to restore cooling water flow.
- Documentation
- Underwater video and stills before and after, with a written report covering coating condition and anode wastage.
How we deliver it at Gambia River
- 1
Scope and vessel details
Tell us the vessel, her particulars, the coating specification and the window at Gambia River. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.
- 2
Permits and approvals
Gambia Ports Authority approves the work alongside the local harbour master, and at a state port that conversation is quicker but less formal — it is worth having in writing. Diving permission, terminal approval and any environmental clearance for in-water work are handled by us, not left with the agent to chase.
- 3
Mobilisation to Gambia River
Divers, compressors, brush carts and cameras mobilise via Banjul (BJL). Where a vessel is also calling at Banjul, one mobilisation is normally sized to cover both.
- 4
Safety setup and the dive
The vessel is secured for diving — main engine, shaft and thrusters immobilised, sea suctions confirmed shut, permit agreed with the master. Teams work under surface supervision with continuous diver communications and video throughout.
- 5
Report and handover
A completion report covering underwater hull cleaning is issued with before-and-after imagery, coating and anode condition and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.
Gambia River Terminals at a glance
- UN/LOCODE
- GMBJL
- Port type
- State Port
- State
- Banjul
- Country
- The Gambia
- Water body
- Gambia River estuary
- Port authority
- Gambia Ports Authority
- Main cargoes
- Fuel and petroleum products, Transhipment and lightering cargo
- Crew mobilisation
- Banjul (BJL)
- Services here
- Hull Cleaning
Frequently asked — Underwater Hull Cleaning at Gambia River
Do you provide underwater hull cleaning at Gambia River Terminals?
Yes. Cleanship Marine works Gambia River Terminals (GMBJL) in Banjul, The Gambia, covering the inner anchorage off Banjul, Mandinari conventional buoy mooring and outer anchorage beyond the bar. Teams mobilise via Banjul (BJL) with the full spread.
When can a tanker's hull be cleaned at the Gambia River terminals?
While she waits at the inner anchorage off Banjul — for the Mandinari buoys or for lighterage — at slack water. Nothing is done while she is moored at Mandinari and discharging. The anchorage wait is usually long enough to plan the clean across several slack-water windows.
Can underwater hull cleaning be done while the vessel works cargo at Gambia River?
Not while a tanker is moored at Mandinari and discharging. Hull work is done at the inner anchorage at slack water — usually during the wait for a berth or for the buoys, which at Banjul is time the vessel is spending anyway. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Gambia River and tell you honestly whether the window you have is enough.
Do you need a diving permit from Gambia Ports Authority?
Yes, and we obtain it. Diving permission from Gambia Ports Authority, terminal approval where the berth requires it, and any environmental clearance for in-water work are arranged as part of the job rather than left with the agent. The master's permit to work and the immobilisation of machinery are agreed on board before anyone enters the water.
What is underwater visibility like at Gambia River?
Visibility at Gambia River Terminals is low — this is a tidal estuary carrying sediment down the Gambia River, and it is at its worst in the rainy season when the river is in flood, and the combination of Atlantic swell and rain sets the outer limits of the calendar. How the tide and sea state shape the dive plan is set out in full in the working-conditions section on this page.
Which vessels do you carry out underwater hull cleaning on at Gambia River?
Product tankers, Vessels waiting for a Banjul berth, Lightering and bunker barges — the traffic at Gambia River Terminals runs to fuel and petroleum products, transhipment and lightering cargo, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.
How quickly can a team mobilise to Gambia River?
Divers and equipment mobilise via Banjul (BJL). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Banjul or Dakar, one mobilisation is often sized to cover both.
What does underwater hull cleaning at Gambia River cost?
It depends on the vessel's dimensions and wetted area, the fouling state found, the coating specification and the working window available at Gambia River. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Gambia River and you get a scoped price, usually the same working day.
Underwater Hull Cleaning at Gambia River Terminals.
Tell us the vessel, her ETA at Gambia River and the window. You get a scope, a crew size and an honest duration — usually the same working day.


