Skip to content
Block CI-40 · CIBAO

Hull Cleaning at Baobab Marine Terminal

In-water hull, propeller and survey work at Baobab Marine Terminal — a deep-water FPSO field in up to 1,300 metres of water.

Get a quote

Tell us the vessel, the port and the window. Scoped reply, usually the same working day.

Or call the 24/7 desk on +91 92365 20609

Cleanship Marine provides the full underwater scope at Baobab Marine Terminal (CIBAO), Block CI-40 — hull cleaning, propeller super polishing, bow and stern thruster work, class-approved in-water survey and UWILD. Every scope is carried out with the vessel afloat and on hire, at the berth or at the anchorage.

Baobab is a deep-water oil field in Block CI-40, operated by CNR International with Svenska Petroleum and Petroci as partners. Its crude is produced and stored on the FPSO Baobab Ivoirien MV10, a 346,000-deadweight-tonne vessel, and exported by shuttle tanker through the Baobab Marine Terminal — the FPSO with its bow moorings, hoses and pipeline end manifold.

Working conditions at Baobab

Baobab is a deep-water field about 25 kilometres off the coast in 900 to 1,300 metres of water, so the FPSO is held by a spread mooring far above the sea bed and everything on the field works in open Atlantic swell. The depth means all work stays close to the surface — on the FPSO's hull, the mooring connections at the hull and the offloading vessels — and it is done under the operator's field permit system.

Where we work
FPSO Baobab Ivoirien on station · Shuttle tanker offloading area · Field support vessel moorings
Vessels we see here
FPSO Baobab Ivoirien MV10 · Shuttle tankers · Offshore support vessels

Hull Cleaning scopes at Baobab

5 scopes, one team and one mobilisation. Most vessels calling here take more than one on the same attendance.

Planning the window at Baobab

The combination of Atlantic swell and rain governs the calendar at Baobab Marine Terminal, with the heaviest rain from May to October and swell running year-round. The swell here is long-period Atlantic ground swell rather than wind-driven sea, so it reaches the anchorages on days that look calm from the bridge and it is the single biggest cause of a lost in-water window on this coast. There is no anchor and no berth here: the FPSO is held on station by her own moorings, and shuttle tankers and support vessels work around her, so the dive plan is built around the field's production and offloading programme and the swell, under the operator's permit system.

Work is taken at the FPSO Baobab Ivoirien on station, shuttle tanker offloading area and field support vessel moorings, and which of those a vessel ends up at changes the dive plan more than the season does. Teams mobilise via Abidjan (ABJ), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.

What we typically find at Baobab

Liquid and gas tonnage here spends long stretches at the terminal or waiting for a slot, so growth tends to be even and well established across the hull rather than patchy — heavier than the trading pattern suggests, and further along than a speed report alone would indicate.

On a 346,000-tonne FPSO that stays on station, the growth that matters is at the sea chests, water intakes and caissons, and around the mooring and riser connections at the hull, where it adds weight and blocks flow. The shuttle tankers show the ordinary pattern of growth from waiting in warm water for their offloading slot.

How we deliver it at Baobab

  1. 1

    Scope and vessel details

    Tell us the vessel, her particulars, the coating specification and the window at Baobab. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.

  2. 2

    Permits and approvals

    Access at Baobab Marine Terminal is the terminal operator's decision as much as CNR International's, so both are in the approval chain from the start — a berth-side refusal discovered at the gangway costs the whole attendance. Diving permission, terminal approval and any environmental clearance for in-water work are handled by us, not left with the agent to chase.

  3. 3

    Mobilisation to Baobab

    Divers, compressors, brush carts and cameras mobilise via Abidjan (ABJ). Where a vessel is also calling at Espoir, one mobilisation is normally sized to cover both.

  4. 4

    Safety setup and the dive

    The vessel is secured for diving — main engine, shaft and thrusters immobilised, sea suctions confirmed shut, permit agreed with the master. Teams work under surface supervision with continuous diver communications and video throughout.

  5. 5

    Report and handover

    A completion report covering hull cleaning is issued with before-and-after imagery, coating and anode condition and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.

Baobab Marine Terminal at a glance

UN/LOCODE
CIBAO
Port type
Private Port
State
Block CI-40
Country
Côte d'Ivoire
Water body
Gulf of Guinea
Port authority
CNR International
Main cargoes
Crude oil
Crew mobilisation
Abidjan (ABJ)
Services here
Hull Cleaning

Frequently asked — Baobab Marine Terminal

Does Cleanship provide hull cleaning at Baobab Marine Terminal?

Yes. We cover the full hull cleaning scope at Baobab Marine Terminal (CIBAO), Block CI-40 — underwater hull cleaning, propeller polishing, thruster cleaning & polishing, in-water class survey and UWILD. Teams mobilise via Abidjan (ABJ).

What is underwater visibility like at Baobab?

Visibility at Baobab Marine Terminal is good — clear, deep open-sea water — so the swell and the field's operations set the window, not what a diver can see, and the combination of Atlantic swell and rain sets the outer limits of the calendar. How the tide and sea state shape the dive plan is set out in full in the working-conditions section on this page.

Who approves hull cleaning work at Baobab?

CNR International issues the port-side approval at Baobab Marine Terminal, with terminal approval on top where the berth requires it. We arrange both, along with any environmental clearance for in-water cleaning, so it does not fall to the agent or the master.

Which vessels call at Baobab?

FPSO Baobab Ivoirien MV10, Shuttle tankers and Offshore support vessels — Baobab Marine Terminal is a deep-water FPSO field in up to 1,300 metres of water, handling crude oil. Wetted area, coating specification and how long the vessel has been sitting are what size a hull job, so the same berth can produce very different attendances.

Can this be done without taking the vessel off hire at Baobab?

Yes — that is the point of it. Every scope listed here is carried out with the vessel afloat and working, at the berth, at the anchorage or on the passage out. Divers work with the vessel afloat at the berth or the anchorage, so there is no dry dock, no diversion and no off-hire.

Do you cover other ports near Baobab?

Yes. Espoir, Lion and Vridi all sit within the same operating range for hull cleaning, and a single mobilisation is often sized to cover more than one vessel on the same trip. We work 80 ports on the coverage list for this line.

Get in touch

Hull Cleaning at Baobab Marine Terminal.

Tell us the vessel, her ETA at Baobab and the window. You get a scope, a crew size and an honest duration — usually the same working day.