Skip to content
Baobab Marine Terminal · CIBAO

Underwater Hull Cleaning at Baobab Marine Terminal

Full hull cleaned in the water, vessel stays on hire

Get a quote

Tell us the vessel, the port and the window. Scoped reply, usually the same working day.

Or call the 24/7 desk on +91 92365 20609

Cleanship Marine provides underwater hull cleaning at Baobab Marine Terminal, Block CI-40, working the FPSO Baobab Ivoirien on station and shuttle tanker offloading area. Commercial dive teams remove slime, weed and shell growth from the vertical sides, flat bottom, bilge keels, sea chests and niche areas with the vessel afloat and on hire — no dry dock, no diversion, no off-hire.

Baobab is a deep-water oil field in Block CI-40, operated by CNR International with Svenska Petroleum and Petroci as partners. Its crude is produced and stored on the FPSO Baobab Ivoirien MV10, a 346,000-deadweight-tonne vessel, and exported by shuttle tanker through the Baobab Marine Terminal — the FPSO with its bow moorings, hoses and pipeline end manifold.

The Baobab Ivoirien MV10 is a very large FPSO — 346,000 deadweight tonnes — moored in deep water where she will stay for her working life. Cleaning a hull that size is planned area by area over a campaign, not in a single dive, with priority given to the sea chests and intakes that feed the plant and the areas around the mooring and riser connections. It is organised with the operator around production and offloading.

What it gets you

  • Hydrodynamic smoothness restored before fouling reaches the calcareous stage that damages coating
  • Fuel and emissions penalty from drag reduced without taking the vessel off hire
  • Documented condition record for the technical file and the next docking specification
  • Sea chests and inlets cleared, protecting cooling water flow

Working conditions at Baobab

Baobab is a deep-water field about 25 kilometres off the coast in 900 to 1,300 metres of water, so the FPSO is held by a spread mooring far above the sea bed and everything on the field works in open Atlantic swell. The depth means all work stays close to the surface — on the FPSO's hull, the mooring connections at the hull and the offloading vessels — and it is done under the operator's field permit system.

Where we work
FPSO Baobab Ivoirien on station · Shuttle tanker offloading area · Field support vessel moorings
Vessels we see here
FPSO Baobab Ivoirien MV10 · Shuttle tankers · Offshore support vessels

What we do at Baobab

  • Pre-clean fouling survey to establish coverage, growth type and coating condition before any tool touches the hull
  • Brush cart cleaning of the flat bottom and vertical sides, with brush hardness selected against your antifouling specification
  • Hand cleaning of bilge keels, rudder, stern frame, thruster tunnels, anodes and the niches a cart cannot follow
  • Sea chest gratings and inlet openings cleared of growth and debris to restore cooling water flow
  • Diving permission cleared with CNR International and the terminal before mobilisation
  • Before-and-after video and stills, with a written report on coating condition and anode wastage

Planning the window at Baobab

The combination of Atlantic swell and rain governs the calendar at Baobab Marine Terminal, with the heaviest rain from May to October and swell running year-round. The swell here is long-period Atlantic ground swell rather than wind-driven sea, so it reaches the anchorages on days that look calm from the bridge and it is the single biggest cause of a lost in-water window on this coast. There is no anchor and no berth here: the FPSO is held on station by her own moorings, and shuttle tankers and support vessels work around her, so the dive plan is built around the field's production and offloading programme and the swell, under the operator's permit system.

Work is taken at the FPSO Baobab Ivoirien on station, shuttle tanker offloading area and field support vessel moorings, and which of those a vessel ends up at changes the dive plan more than the season does. Teams mobilise via Abidjan (ABJ), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.

What we typically find at Baobab

Liquid and gas tonnage here spends long stretches at the terminal or waiting for a slot, so growth tends to be even and well established across the hull rather than patchy — heavier than the trading pattern suggests, and further along than a speed report alone would indicate.

On a 346,000-tonne FPSO that stays on station, the growth that matters is at the sea chests, water intakes and caissons, and around the mooring and riser connections at the hull, where it adds weight and blocks flow. The shuttle tankers show the ordinary pattern of growth from waiting in warm water for their offloading slot.

Standard scope of work

Included as standard on every underwater hull cleaning attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.

Fouling survey
A pre-clean dive establishes fouling type, coverage and severity, and confirms coating condition so the correct tooling is selected.
Flat bottom and vertical sides
Brush cart cleaning of large areas, removing slime, weed and shell growth to restore surface smoothness.
Niche areas
Hand cleaning of bilge keels, bow thruster tunnels, rudder, stern frame, anodes and other niche areas where fouling concentrates.
Sea chests and gratings
Sea chest gratings and inlet openings cleared of growth and debris to restore cooling water flow.
Documentation
Underwater video and stills before and after, with a written report covering coating condition and anode wastage.

How we deliver it at Baobab

  1. 1

    Scope and vessel details

    Tell us the vessel, her particulars, the coating specification and the window at Baobab. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.

  2. 2

    Permits and approvals

    Access at Baobab Marine Terminal is the terminal operator's decision as much as CNR International's, so both are in the approval chain from the start — a berth-side refusal discovered at the gangway costs the whole attendance. Diving permission, terminal approval and any environmental clearance for in-water work are handled by us, not left with the agent to chase.

  3. 3

    Mobilisation to Baobab

    Divers, compressors, brush carts and cameras mobilise via Abidjan (ABJ). Where a vessel is also calling at Espoir, one mobilisation is normally sized to cover both.

  4. 4

    Safety setup and the dive

    The vessel is secured for diving — main engine, shaft and thrusters immobilised, sea suctions confirmed shut, permit agreed with the master. Teams work under surface supervision with continuous diver communications and video throughout.

  5. 5

    Report and handover

    A completion report covering underwater hull cleaning is issued with before-and-after imagery, coating and anode condition and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.

Baobab Marine Terminal at a glance

UN/LOCODE
CIBAO
Port type
Private Port
State
Block CI-40
Country
Côte d'Ivoire
Water body
Gulf of Guinea
Port authority
CNR International
Main cargoes
Crude oil
Crew mobilisation
Abidjan (ABJ)
Services here
Hull Cleaning

Frequently asked — Underwater Hull Cleaning at Baobab

Do you provide underwater hull cleaning at Baobab Marine Terminal?

Yes. Cleanship Marine works Baobab Marine Terminal (CIBAO) in Block CI-40, Côte d'Ivoire, covering the FPSO Baobab Ivoirien on station, shuttle tanker offloading area and field support vessel moorings. Teams mobilise via Abidjan (ABJ) with the full spread.

How is the hull of a large FPSO like Baobab Ivoirien cleaned?

In stages, as a planned campaign rather than a single dive, starting with the sea chests, water intakes and the areas around the mooring and riser connections. We organise it with the operator around production and offloading, under the field's permit system.

Can underwater hull cleaning be done while the vessel works cargo at Baobab?

Only within the operator's permit system. Work on the FPSO is planned around production and offloading; shuttle tankers are cleaned while they wait in the field, never during a connected offloading. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Baobab and tell you honestly whether the window you have is enough.

Do you need a diving permit from CNR International?

Yes, and we obtain it. Diving permission from CNR International, terminal approval where the berth requires it, and any environmental clearance for in-water work are arranged as part of the job rather than left with the agent. The master's permit to work and the immobilisation of machinery are agreed on board before anyone enters the water.

What is underwater visibility like at Baobab?

Visibility at Baobab Marine Terminal is good — clear, deep open-sea water — so the swell and the field's operations set the window, not what a diver can see, and the combination of Atlantic swell and rain sets the outer limits of the calendar. How the tide and sea state shape the dive plan is set out in full in the working-conditions section on this page.

Which vessels do you carry out underwater hull cleaning on at Baobab?

FPSO Baobab Ivoirien MV10, Shuttle tankers and Offshore support vessels — the traffic at Baobab Marine Terminal runs to crude oil, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.

How quickly can a team mobilise to Baobab?

Divers and equipment mobilise via Abidjan (ABJ). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Espoir or Lion, one mobilisation is often sized to cover both.

What does underwater hull cleaning at Baobab cost?

It depends on the vessel's dimensions and wetted area, the fouling state found, the coating specification and the working window available at Baobab. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Baobab and you get a scoped price, usually the same working day.

Get in touch

Underwater Hull Cleaning at Baobab Marine Terminal.

Tell us the vessel, her ETA at Baobab and the window. You get a scope, a crew size and an honest duration — usually the same working day.