In-Water Class Survey at Puttalam Port
Class attendance without opening a dry dock
Get a quote
Tell us the vessel, the port and the window. Scoped reply, usually the same working day.
Cleanship Marine delivers class-approved in-water surveys at Puttalam Port, North Western Province, with high-definition live video to a surface monitoring station, diver-to-surveyor communications and a full report package for the class file.
Classification societies accept in-water survey in place of drydocking for many vessels and inspection scopes, provided the work is done by an approved diving contractor to a defined procedure with the surveyor able to see the structure in real time. Low visibility and short slack windows make this a demanding survey port. Scope, lighting and the surveyor's acceptance criteria are agreed up front, and where the conditions will not support the scope we say so before the attendance is booked.
What it gets you
- Survey requirement satisfied without opening a dry dock or taking the vessel off hire
- Surveyor sees the structure live rather than reviewing a recording after the fact
- Defects located precisely against hull reference marks, not described approximately
- A report package built for the class file, not a video dump
Working conditions at Puttalam
Puttalam is a shallow lagoon port serving the cement industry, so depth restricts what can come alongside and larger tonnage is lightened at anchor. Lagoon water is warm, brackish and silty with low visibility, and cement and limestone dust in the water column reduces it further around active loading. The south-west monsoon is the limiting season.
- Where we work
- Cement jetty · Lagoon anchorage · Lightering position
- Vessels we see here
- Handysize bulk carriers · Barges and coastal craft
What we do at Puttalam
- Survey programme agreed in advance with the class society and the surveyor attending at Puttalam
- Hull plating, welds, sea chests, rudder, propeller and stern gear inspected to the agreed scope
- Live high-definition video to the surface station with two-way diver-to-surveyor communications
- Hull markings and reference points confirmed so the surveyor can locate every feature precisely
- Diving permission and any environmental clearance cleared with Sri Lanka Ports Authority
- Full report package with video, stills and findings issued for the class file
Planning the window at Puttalam
The two monsoons governs the calendar at Puttalam Port, the south-west from May to September and the north-east from December to February. Which one matters depends on which coast the port is on — the south-west monsoon closes the western and southern anchorages while the east coast stays workable, and the north-east monsoon reverses it. Sri Lanka is the one market on the coverage list where there is almost always a workable coast. The tidal stream and the silt load govern the method here: the working window is slack water, not the working day, and the operation is planned by feel and surface supervision with video kept as the record rather than as the diver's means of navigation.
Work is taken at the cement jetty, lagoon anchorage and lightering position, and which of those a vessel ends up at changes the dive plan more than the season does. Teams mobilise via Colombo (CMB), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.
What we typically find at Puttalam
Dry bulk handling here puts cargo dust into the water around the berths and anchorage. It settles on horizontal surfaces and packs into sea chest gratings and inlet openings, so inlet and grating clearance is routinely a larger part of the job at Puttalam than owners budget for.
Silt settles over the growth on the flat bottom and in the niches, which masks the true fouling state until the divers are actually on it. That is why the pre-clean survey here is a real step rather than a formality.
Standard scope of work
Included as standard on every in-water class survey attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.
- Hull structure inspection
- Shell plating, welds, bilge keels and openings inspected with continuous video and commentary, with cleaning of areas as needed for meaningful viewing.
- Rudder and steering gear
- Rudder plating, pintles, bearings and clearances inspected and, where required, measured.
- Propeller and stern arrangement
- Propeller, boss, rope guard and stern tube seal inspected for damage, erosion and leakage.
- Sea chests and openings
- Sea chests, gratings, valves and overboard discharges inspected and recorded.
- Anodes and coating
- Sacrificial anode wastage assessed and coating condition mapped for planning the next dry docking.
How we deliver it at Puttalam
- 1
Scope and vessel details
Tell us the vessel, her particulars, the coating specification and the window at Puttalam. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.
- 2
Permits and approvals
Sri Lanka Ports Authority approves the work alongside the local harbour master, and at a state port that conversation is quicker but less formal — it is worth having in writing. Diving permission, terminal approval and any environmental clearance for in-water work are handled by us, not left with the agent to chase.
- 3
Mobilisation to Puttalam
Divers, compressors, brush carts and cameras mobilise via Colombo (CMB). Where a vessel is also calling at Colombo, one mobilisation is normally sized to cover both.
- 4
Safety setup and the dive
The vessel is secured for diving — main engine, shaft and thrusters immobilised, sea suctions confirmed shut, permit agreed with the master. Teams work under surface supervision with continuous diver communications and video throughout.
- 5
Report and handover
A completion report covering in-water class survey is issued with before-and-after imagery, coating and anode condition and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.
Puttalam Port at a glance
- UN/LOCODE
- LKPTL
- Port type
- State Port
- State
- North Western Province
- Country
- Sri Lanka
- Water body
- Puttalam Lagoon
- Port authority
- Sri Lanka Ports Authority
- Main cargoes
- Cement and clinker, Limestone, Coal, Salt, General cargo
- Crew mobilisation
- Colombo (CMB)
- Services here
- Hull Cleaning and Hold Cleaning
Frequently asked — In-Water Survey at Puttalam
Do you provide in-water class survey at Puttalam Port?
Yes. Cleanship Marine works Puttalam Port (LKPTL) in North Western Province, Sri Lanka, covering the cement jetty, lagoon anchorage and lightering position. Teams mobilise via Colombo (CMB) with the full spread.
Can in-water class survey be done while the vessel works cargo at Puttalam?
Usually yes, but the tide sets the schedule rather than the cargo plan. The practical question is how many slack windows fall inside the vessel's stay, not what the holds are doing. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Puttalam and tell you honestly whether the window you have is enough.
Do you need a diving permit from Sri Lanka Ports Authority?
Yes, and we obtain it. Diving permission from Sri Lanka Ports Authority, terminal approval where the berth requires it, and any environmental clearance for in-water work are arranged as part of the job rather than left with the agent. The master's permit to work and the immobilisation of machinery are agreed on board before anyone enters the water.
What is underwater visibility like at Puttalam?
Visibility at Puttalam Port is habitually very low, and often close to nil at the turn, and the two monsoons sets the outer limits of the calendar. How the tide and sea state shape the dive plan is set out in full in the working-conditions section on this page.
Which vessels do you carry out in-water class survey on at Puttalam?
Handysize bulk carriers, Barges and coastal craft — the traffic at Puttalam Port runs to cement and clinker, limestone, coal, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.
How quickly can a team mobilise to Puttalam?
Divers and equipment mobilise via Colombo (CMB). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Colombo or Trincomalee, one mobilisation is often sized to cover both.
What does in-water class survey at Puttalam cost?
It depends on the vessel's dimensions and wetted area, the fouling state found, the coating specification and the working window available at Puttalam. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Puttalam and you get a scoped price, usually the same working day.
In-Water Class Survey at Puttalam Port.
Tell us the vessel, her ETA at Puttalam and the window. You get a scope, a crew size and an honest duration — usually the same working day.


