Skip to content
Sèmè Terminal · BJSEM

In-Water Class Survey at Sèmè Terminal

Class attendance without opening a dry dock

Get a quote

Tell us the vessel, the port and the window. Scoped reply, usually the same working day.

Or call the 24/7 desk on +91 92365 20609

Cleanship Marine delivers class-approved in-water surveys at Sèmè Terminal, Ouémé, with high-definition live video to a surface monitoring station, diver-to-surveyor communications and a full report package for the class file.

Classification societies accept in-water survey in place of drydocking for many vessels and inspection scopes, provided the work is done by an approved diving contractor to a defined procedure with the surveyor able to see the structure in real time. Survey work at an open anchorage lives and dies on the weather window, so class attendance is booked with a realistic standby allowance rather than a single optimistic date.

Sèmè's water is clearer than the harbour ports to the west because it is open sea rather than a basin fed by a lagoon, and on a calm day that gives a surveyor a good picture. The difficulty is the other way round from Cotonou: not what the camera can see, but whether the swell lets a diver hold position alongside the hull for the length of a survey. Survey dates here are therefore planned with standby built in, and the survey is fitted into the wait for the loading slot so the vessel loses no time to it.

What it gets you

  • Survey requirement satisfied without opening a dry dock or taking the vessel off hire
  • Surveyor sees the structure live rather than reviewing a recording after the fact
  • Defects located precisely against hull reference marks, not described approximately
  • A report package built for the class file, not a video dump

Working conditions at Sèmè

Sèmè has no harbour at all. Tankers load offshore at a single point mooring, so every vessel here lies in open Gulf of Guinea water with nothing between her and the long-period Atlantic swell that runs onto this coast. That swell, not visibility, decides whether a dive goes ahead. The water itself is warm and — away from the lagoon outflows further west at Cotonou — clearer than the harbour ports, which helps inspection work on the days the sea allows it. No work is ever done at the buoy or while a tanker is connected.

Where we work
Tanker waiting area off the terminal · Sea area outside the SPM safety zone
Vessels we see here
Crude oil tankers · Mooring and terminal support vessels · Offshore supply and crew boats

What we do at Sèmè

  • Survey programme agreed in advance with the class society and the surveyor attending at Sèmè
  • Hull plating, welds, sea chests, rudder, propeller and stern gear inspected to the agreed scope
  • Live high-definition video to the surface station with two-way diver-to-surveyor communications
  • Hull markings and reference points confirmed so the surveyor can locate every feature precisely
  • Diving permission and any environmental clearance cleared with WAPCO, the terminal operator
  • Full report package with video, stills and findings issued for the class file

Planning the window at Sèmè

The combination of Atlantic swell and rain governs the calendar at Sèmè Terminal, with the heaviest rain from May to October and swell running year-round. The swell here is long-period Atlantic ground swell rather than wind-driven sea, so it reaches the anchorages on days that look calm from the bridge and it is the single biggest cause of a lost in-water window on this coast. The buoy itself is off limits, so hull work is done with the tanker in the waiting area off the terminal, before she is called to the SPM or after she is released; the dive plan is built around the loading schedule and the swell.

Work is taken at the tanker waiting area off the terminal and sea area outside the SPM safety zone, and which of those a vessel ends up at changes the dive plan more than the season does. Teams mobilise via Cotonou (COO), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.

What we typically find at Sèmè

Liquid and gas tonnage here spends long stretches at the terminal or waiting for a slot, so growth tends to be even and well established across the hull rather than patchy — heavier than the trading pattern suggests, and further along than a speed report alone would indicate.

Tankers coming to Sèmè have usually crossed from their last discharge in ballast and may then wait offshore for their loading slot, and it is that waiting in warm Gulf of Guinea water that adds growth fastest. A clean done before loading removes it before the laden voyage, where it would cost the most.

Standard scope of work

Included as standard on every in-water class survey attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.

Hull structure inspection
Shell plating, welds, bilge keels and openings inspected with continuous video and commentary, with cleaning of areas as needed for meaningful viewing.
Rudder and steering gear
Rudder plating, pintles, bearings and clearances inspected and, where required, measured.
Propeller and stern arrangement
Propeller, boss, rope guard and stern tube seal inspected for damage, erosion and leakage.
Sea chests and openings
Sea chests, gratings, valves and overboard discharges inspected and recorded.
Anodes and coating
Sacrificial anode wastage assessed and coating condition mapped for planning the next dry docking.

How we deliver it at Sèmè

  1. 1

    Scope and vessel details

    Tell us the vessel, her particulars, the coating specification and the window at Sèmè. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.

  2. 2

    Permits and approvals

    Access at Sèmè Terminal is the terminal operator's decision as much as WAPCO, the terminal operator's, so both are in the approval chain from the start — a berth-side refusal discovered at the gangway costs the whole attendance. Diving permission, terminal approval and any environmental clearance for in-water work are handled by us, not left with the agent to chase.

  3. 3

    Mobilisation to Sèmè

    Divers, compressors, brush carts and cameras mobilise via Cotonou (COO). Where a vessel is also calling at Cotonou, one mobilisation is normally sized to cover both.

  4. 4

    Safety setup and the dive

    The vessel is secured for diving — main engine, shaft and thrusters immobilised, sea suctions confirmed shut, permit agreed with the master. Teams work under surface supervision with continuous diver communications and video throughout.

  5. 5

    Report and handover

    A completion report covering in-water class survey is issued with before-and-after imagery, coating and anode condition and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.

Sèmè Terminal at a glance

UN/LOCODE
BJSEM
Port type
Private Port
State
Ouémé
Country
Benin
Water body
Bight of Benin, Gulf of Guinea
Port authority
WAPCO, the terminal operator
Main cargoes
Crude oil
Crew mobilisation
Cotonou (COO)
Services here
Hull Cleaning

Frequently asked — In-Water Survey at Sèmè

Do you provide in-water class survey at Sèmè Terminal?

Yes. Cleanship Marine works Sèmè Terminal (BJSEM) in Ouémé, Benin, covering the tanker waiting area off the terminal and sea area outside the SPM safety zone. Teams mobilise via Cotonou (COO) with the full spread.

Can a class survey be done while the tanker waits for her Sèmè loading slot?

Yes, and that is the best time for it — the vessel is waiting anyway. The survey programme is agreed with the class society in advance, and because Sèmè is an open-sea location we build standby into the plan for the swell rather than committing to a single date.

Can in-water class survey be done while the vessel works cargo at Sèmè?

No — nothing is done while a tanker is connected to the buoy and loading. Hull work is done in the waiting area off the terminal before she is called in, or after she is released, which at Sèmè is usually time she is spending waiting anyway. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Sèmè and tell you honestly whether the window you have is enough.

Do you need a diving permit from WAPCO, the terminal operator?

Yes, and we obtain it. Diving permission from WAPCO, the terminal operator, terminal approval where the berth requires it, and any environmental clearance for in-water work are arranged as part of the job rather than left with the agent. The master's permit to work and the immobilisation of machinery are agreed on board before anyone enters the water.

What is underwater visibility like at Sèmè?

Visibility at Sèmè Terminal is good for this coast — open sea water, away from the lagoon outflows at Cotonou — so the limit here is the swell rather than what a diver can see, and the combination of Atlantic swell and rain sets the outer limits of the calendar. How the tide and sea state shape the dive plan is set out in full in the working-conditions section on this page.

Which vessels do you carry out in-water class survey on at Sèmè?

Crude oil tankers, Mooring and terminal support vessels, Offshore supply and crew boats — the traffic at Sèmè Terminal runs to crude oil, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.

How quickly can a team mobilise to Sèmè?

Divers and equipment mobilise via Cotonou (COO). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Cotonou or Lomé, one mobilisation is often sized to cover both.

What does in-water class survey at Sèmè cost?

It depends on the vessel's dimensions and wetted area, the fouling state found, the coating specification and the working window available at Sèmè. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Sèmè and you get a scoped price, usually the same working day.

Get in touch

In-Water Class Survey at Sèmè Terminal.

Tell us the vessel, her ETA at Sèmè and the window. You get a scope, a crew size and an honest duration — usually the same working day.