Get a quote

Tell us the vessel, the port and the window. Scoped reply, usually the same working day.

Or call the 24/7 desk on +91 92365 20609

Cleanship Marine cleans shore storage tanks at the terminals serving Jubail Port, Eastern Province — product changeovers, inspection preparation and statutory maintenance, delivered under a full enclosed-space and hot-work regime.

A shore tank out of service is storage capacity earning nothing, so the schedule matters as much as the standard. Jubail Commercial Port serves Saudi Arabia's petrochemical heartland, loading chemicals, polymers and sulphur alongside containers and project cargo. The tonnage is specialised and the port calls are governed end to end by terminal windows. Work is planned with the terminal's own permit system and safety case, and the certification chain — gas-free, entry, hot work where needed — is treated as the critical path it actually is.

What it gets you

  • Tank returned to service on a schedule the terminal can plan around
  • Inspection or recoating preparation done to a standard the inspector accepts
  • Waste and sludge disposal fully documented
  • Work carried out under the terminal's permit system, not alongside it

Working conditions at Jubail

Work here starts alongside, and where the berth window runs out it continues on the outward passage with a riding crew — the berth will not be held open for it. The shamal sets the outer limits of the calendar, through the winter months and again in early summer, and it affects the anchorage far more than the berth. The larger constraint here is heat. Between June and September, working temperatures inside a cargo hold or a tank at this port routinely exceed anything a full shift can be worked in, so enclosed-space work runs to shortened cycles with enforced rest, forced ventilation and more people than the same job needs in winter. Pricing a Gulf summer tank entry on a winter productivity assumption is the most common way these jobs overrun. Approval runs through Mawani and the Royal Commission for Jubail and the terminal operator, and licensed slop reception is booked before the tanks are opened — at most ports on this list that booking, not the cleaning, is what sets the date.

Where we work
Chemical and liquid berths · General cargo quays · Outer anchorage
Vessels we see here
Chemical and product tankers · LPG carriers · Bulk carriers · General cargo and project vessels

What we do at Jubail

  • Method statement and risk assessment agreed with the terminal before mobilisation
  • Draining, purging, gas-freeing and atmosphere monitoring throughout
  • Sludge and residue removal, floor and shell cleaning, roof and internal structure
  • Preparation for internal inspection, thickness measurement or recoating
  • Waste transferred to licensed disposal under the rules in force at Jubail
  • Certification and completion documentation for the terminal's records

Planning the window at Jubail

The shamal governs the calendar at Jubail Port, through the winter months and again in early summer. For tank work it is the anchorage that suffers — where the terminal will not permit work alongside, weather that closes the anchorage closes the job. Terminal windows here are tight and most operators will not permit tank work alongside, so the realistic plan is the anchorage or the outward passage. That is agreed before the vessel arrives, not argued at the berth.

Teams mobilise via Dammam (DMM), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.

What we typically find at Jubail

Chemical and petrochemical grades move through here, so the cleaning specification changes with almost every voyage and is set by the next charterer's acceptance criteria. The wash plan is built from the prior-cargo and next-cargo pair, not from a standard procedure.

Tanks here are usually presented with a machine wash already done and the hand work outstanding — bottom structure, suction wells, heating coils and the areas the machines cannot reach. That remainder is what a wall wash actually fails on.

Standard scope of work

Included as standard on every shore tank cleaning attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.

Product and residue removal
Remaining product is stripped and transferred, and pumpable sludge is recovered to nominated tankage or road tankers.
Sludge treatment and oil recovery
Where volumes justify it, sludge is treated to recover saleable hydrocarbon and reduce the mass sent to disposal.
Washing and degreasing
Shell, floor, roof structure and internal fittings are washed and degreased to the standard required by the next activity.
Gas-freeing and monitoring
Forced ventilation to safe-for-entry or gas-free-for-hot-work condition, with continuous atmospheric monitoring throughout occupancy.
Inspection preparation
Floor plates, annular rings, weld seams and roof supports are cleaned to a condition that allows meaningful thickness measurement and visual inspection.

How we deliver it at Jubail

  1. 1

    Scope and vessel details

    Tell us the vessel, her particulars, the prior and next grade and the window at Jubail. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.

  2. 2

    Approvals, slops and certification

    Mawani and the Royal Commission for Jubail runs a statutory permit process here, so the lead time is real and the application goes in early rather than on arrival. Licensed slop and sludge reception is booked and marine chemist attendance arranged where the grade change requires it. At Jubail the disposal route is the item that most often sets the schedule, so it is fixed first.

  3. 3

    Mobilisation to Jubail

    Crews, pumps, machines and chemicals mobilise via Dammam (DMM). Where a vessel is also calling at Dammam, one mobilisation is normally sized to cover both.

  4. 4

    Gas-freeing, entry and cleaning

    Atmosphere testing, gas-freeing and enclosed-space entry certification come before any entry, and are repeated after every break. Standby cover and atmosphere monitoring run continuously while anyone is inside, and progress is reported tank by tank.

  5. 5

    Report and handover

    A completion report covering shore tank cleaning is issued with before-and-after imagery, tank by tank and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.

Jubail Port at a glance

UN/LOCODE
SAJBI
Port type
Major Port
State
Eastern Province
Country
Saudi Arabia
Water body
Arabian Gulf
Port authority
Mawani and the Royal Commission for Jubail
Main cargoes
Petrochemicals, Liquid chemicals, Sulphur, Containers, Project cargo and steel
Crew mobilisation
Dammam (DMM)
Services here
Hull Cleaning, Hold Cleaning and Tank Cleaning

Frequently asked — Shore Tank Cleaning at Jubail

Do you provide shore tank cleaning at Jubail Port?

Yes. Cleanship Marine works Jubail Port (SAJBI) in Eastern Province, Saudi Arabia, covering the chemical and liquid berths, general cargo quays, outer anchorage. Teams mobilise via Dammam (DMM) with the full spread.

Can shore tank cleaning be done while the vessel works cargo at Jubail?

Most terminals here will not permit tank work alongside, so the plan is the anchorage or the outward passage. We confirm the terminal's position before quoting rather than discovering it at the gangway. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Jubail and tell you honestly whether the window you have is enough.

How is slop and sludge disposal handled at Jubail?

Through licensed reception, booked with Mawani and the Royal Commission for Jubail and the terminal operator before the tanks are opened. At Jubail the disposal route is usually what sets the schedule, so it is fixed first and documented tank by tank. Gas-freeing, atmosphere testing and enclosed-space entry certification are part of the same scope.

Where is the work done at Jubail — alongside, at anchorage or on passage?

Work here starts alongside, and where the berth window runs out it continues on the outward passage with a riding crew — the berth will not be held open for it. Between June and September the binding constraint is working temperature inside the space rather than access to it.

Which vessels do you carry out shore tank cleaning on at Jubail?

Chemical and product tankers, LPG carriers, Bulk carriers, General cargo and project vessels — the traffic at Jubail Port runs to petrochemicals, liquid chemicals and sulphur, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.

How quickly can a team mobilise to Jubail?

Crews and equipment mobilise via Dammam (DMM). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Yanbu, one mobilisation is often sized to cover both.

What does shore tank cleaning at Jubail cost?

It depends on the tank count and volume, the prior and next grade, how much sludge is in there and whether the work runs alongside, at anchorage or on passage from Jubail. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Jubail and you get a scoped price, usually the same working day.

Get in touch