Cleanship Marine carries out cargo tank cleaning on dirty and clean petroleum product tankers at Pipavav Port, Gujarat — grade changes, wall-wash preparation and gas-freeing worked to the acceptance criteria of the next cargo, not to a generic procedure.

Pipavav is a privately operated all-weather port on the Gujarat coast handling containers, RoRo and dry bulk, with a rail link into the northern hinterland. It draws liner container and car carrier traffic on fixed rotations, which is the kind of predictable calling pattern that suits planned underwater maintenance.

What it gets you

  • Tanks presented to the standard the next charterer will actually accept
  • Wall-wash failures and the resulting rejection or delay avoided
  • Slop disposal documented through licensed reception, not improvised
  • Entry and gas-freeing certified rather than assumed

Working conditions at Pipavav

Work here starts alongside, and where the berth window runs out it continues on the outward passage with a riding crew — the berth will not be held open for it. The south-west monsoon sets the outer limits of the calendar, roughly June to September, and it affects the anchorage far more than the berth. Approval runs through Gujarat Pipavav Port Limited and the terminal operator, and licensed slop reception is booked before the tanks are opened — at most ports on this list that booking, not the cleaning, is what sets the date.

Where we work
Container berths · Bulk berths · RoRo berth · Anchorage
Vessels we see here
Container ships · Pure car and truck carriers · Bulk carriers · Product tankers

What we do at Pipavav

  • Cleaning plan built from the prior-cargo and next-cargo pair, with the acceptance criteria agreed in writing first
  • Tank washing, steaming and chemical treatment as the grade change requires
  • Gas-freeing, atmosphere testing and enclosed-space entry certification before any entry
  • Hand mopping, wall wash and final presentation for surveyor inspection
  • Slops and residues transferred to licensed reception at Pipavav with documentation
  • Tank-by-tank record and a completion report for the vessel and the charterer

Planning the window at Pipavav

The south-west monsoon governs the calendar at Pipavav Port, roughly June to September. Swell and reduced surface visibility close most open-water work on this coast for the duration, and the weeks either side are unreliable rather than unusable. Terminal windows here are tight and most operators will not permit tank work alongside, so the realistic plan is the anchorage or the outward passage. That is agreed before the vessel arrives, not argued at the berth.

Teams mobilise via Diu (DIU) or Rajkot (RAJ), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.

What we typically find at Pipavav

The liquid side at Pipavav is product and chemical parcels on smaller tonnage, with the terminal setting the conditions for work alongside. The port's sheltered all-weather water makes the anchorage a reliable fallback where the berth will not carry it.

Product parcels and bunkers dominate the liquid traffic here, so most of the work is grade changes and fuel and slop tank cleaning rather than full chemical specification work.

Standard scope of work

Included as standard on every tanker tank cleaning attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.

Pre-clean assessment
Cargo history, tank coating condition, heating coil status and the next cargo specification are reviewed to fix the cleaning method and realistic acceptance criteria.
Machine washing
Fixed and portable tank cleaning machines run to a calculated cycle programme, using hot or cold sea water, fresh water and approved chemicals as the cargo pair requires.
Hand hosing and manual finishing
Bellmouths, suction wells, framing, heating coils and structural shadows are hand-hosed and manually finished — the areas machines geometrically cannot reach.
Draining, mopping and drying
Tanks are stripped, mopped and dried so no free water or residue remains to contaminate the next grade or skew the wall wash result.
Gas-freeing and verification
Ventilation to safe-for-entry or gas-free-for-hot-work condition, with continuous monitoring and independent certification arranged where required.

How we deliver it at Pipavav

  1. 1

    Scope and vessel details

    Tell us the vessel, her particulars, the prior and next grade and the window at Pipavav. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.

  2. 2

    Approvals, slops and certification

    Terminal and port approval for tank work is obtained from Gujarat Pipavav Port Limited and the terminal operator, licensed slop and sludge reception is booked, and marine chemist attendance is arranged where the grade change requires it. At Pipavav the disposal route is the item that most often sets the schedule, so it is fixed first.

  3. 3

    Mobilisation to Pipavav

    Crews, pumps, machines and chemicals mobilise via Diu (DIU) or Rajkot (RAJ). Where a vessel is also calling at Bhavnagar, one mobilisation is normally sized to cover both.

  4. 4

    Gas-freeing, entry and cleaning

    Atmosphere testing, gas-freeing and enclosed-space entry certification come before any entry, and are repeated after every break. Standby cover and atmosphere monitoring run continuously while anyone is inside, and progress is reported tank by tank.

  5. 5

    Report and handover

    A completion report covering tanker tank cleaning is issued with before-and-after imagery, tank by tank and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.

Pipavav Port at a glance

UN/LOCODE
INPAV
Port type
Private Port
State
Gujarat
Country
India
Water body
Arabian Sea off Saurashtra
Port authority
Gujarat Pipavav Port Limited
Main cargoes
Containers, Dry bulk, RoRo and automobiles, Liquid bulk, Fertiliser
Crew mobilisation
Diu (DIU) / Rajkot (RAJ)
Services here
Hull Cleaning, Hold Cleaning and Tank Cleaning

Frequently asked — Tanker Tank Cleaning at Pipavav

Do you provide tanker tank cleaning at Pipavav Port?

Yes. Cleanship Marine works Pipavav Port (INPAV) in Gujarat, India, covering the container berths, bulk berths, RoRo berth and anchorage. Teams mobilise via Diu (DIU) or Rajkot (RAJ) with the full spread.

Can tanker tank cleaning be done while the vessel works cargo at Pipavav?

Most terminals here will not permit tank work alongside, so the plan is the anchorage or the outward passage. We confirm the terminal's position before quoting rather than discovering it at the gangway. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Pipavav and tell you honestly whether the window you have is enough.

How is slop and sludge disposal handled at Pipavav?

Through licensed reception, booked with Gujarat Pipavav Port Limited and the terminal operator before the tanks are opened. At Pipavav the disposal route is usually what sets the schedule, so it is fixed first and documented tank by tank. Gas-freeing, atmosphere testing and enclosed-space entry certification are part of the same scope.

Where is the work done at Pipavav — alongside, at anchorage or on passage?

Work here starts alongside, and where the berth window runs out it continues on the outward passage with a riding crew — the berth will not be held open for it.

Which vessels do you carry out tanker tank cleaning on at Pipavav?

Container ships, Pure car and truck carriers, Bulk carriers, Product tankers — the traffic at Pipavav Port runs to containers, dry bulk, roro and automobiles, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.

How quickly can a team mobilise to Pipavav?

Crews and equipment mobilise via Diu (DIU) or Rajkot (RAJ). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Mundra, one mobilisation is often sized to cover both.

What does tanker tank cleaning at Pipavav cost?

It depends on the tank count and volume, the prior and next grade, how much sludge is in there and whether the work runs alongside, at anchorage or on passage from Pipavav. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Pipavav and you get a scoped price, usually the same working day.