UWILD at Abidjan Port
Survey credit earned without leaving the water
Get a quote
Tell us the vessel, the port and the window. Scoped reply, usually the same working day.
Cleanship Marine runs full UWILD programmes — Underwater Inspection In Lieu of Drydocking — at Abidjan Port, Abidjan, from eligibility discussion through class liaison to the final report package.
UWILD lets a vessel satisfy a survey requirement that would otherwise mean a dry docking, at a fraction of the cost and with none of the off-hire. The requirements are exacting: the contractor must hold class approval, the vessel must be eligible, hull markings must let the surveyor locate features precisely, and the inspection has to be delivered live and documented. Shelter is on your side here — the vessel is stable and the dive is uninterrupted — but basin silt means the lighting and camera plan has to be agreed with the surveyor before the class attendance is booked, not improvised on the day.
What it gets you
- Drydocking deferred and the survey credit earned in the water
- Class liaison handled end to end rather than left with the superintendent
- Eligibility confirmed before cost is committed, not discovered afterwards
- A documented inspection record that stands up to class review
Working conditions at Abidjan
Abidjan sits inside the Ébrié Lagoon behind the Vridi Canal, so once a vessel is through the entrance she is in genuinely sheltered water — the Atlantic swell that governs the rest of this coast stops at the canal. The trade-off is lagoon water: warm, brackish, low visibility, and a fouling environment that is among the most aggressive in the region. Growth returns here faster than owners plan for.
- Where we work
- Container terminal berths · Oil and general cargo quays · Lagoon anchorage
- Vessels we see here
- Container ships · Product tankers · General cargo and reefer vessels · Fishing fleet and support craft
What we do at Abidjan
- Eligibility review against the vessel's age, type, class notation and survey history before anything is booked
- Programme agreed with the class society and the surveyor attending at Abidjan
- Hull, rudder, propeller, stern gear, sea chests and appendages inspected to the UWILD scope
- Live video, thickness measurement and clearance readings where the programme calls for them
- Diving permission cleared with Port Autonome d'Abidjan, with the vessel secured and machinery immobilised
- Complete report package submitted for the class file and the drydocking credit
Planning the window at Abidjan
The Atlantic swell and the rains governs the calendar at Abidjan Port, with the heaviest rain from May to October and swell running year-round. The swell here is long-period Atlantic ground swell rather than wind-driven sea, so it reaches the anchorages on days that look calm from the bridge and it is the single biggest cause of a lost in-water window on this coast. Because the harbour is sheltered, work here normally runs alongside or at a protected anchorage and can proceed in parallel with cargo operations rather than competing with them for the berth window.
Work is taken at the container terminal berths, oil and general cargo quays, lagoon anchorage, and which of those a vessel ends up at changes the dive plan more than the season does. Teams mobilise via Abidjan (ABJ), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.
What we typically find at Abidjan
Liquid and gas tonnage here spends long stretches at the terminal or waiting for a slot, so growth tends to be even and well established across the hull rather than patchy — heavier than the trading pattern suggests, and further along than a speed report alone would indicate.
Shelter is a mixed blessing for a hull. The same calm that makes the port easy to work in is still water, and still water grows fouling faster than an exposed berth does.
Standard scope of work
Included as standard on every UWILD attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.
- Eligibility and planning
- Vessel eligibility, survey scope and the society's specific requirements are established and agreed before mobilisation.
- Hull preparation
- Reference markings and cleaning of inspection areas so structure and features can be located and viewed unambiguously.
- Systematic inspection
- Shell plating, welds, rudder, propeller, sea chests, openings, anodes and appendages inspected to the agreed programme.
- Measurement and NDT
- Clearance measurement and underwater NDT carried out where the survey scope requires it.
- Documentation
- Video, stills, measurements and findings compiled into a report package suitable for submission to the classification society.
How we deliver it at Abidjan
- 1
Scope and vessel details
Tell us the vessel, her particulars, the coating specification and the window at Abidjan. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.
- 2
Permits and approvals
Port Autonome d'Abidjan approves the work alongside the local harbour master, and at a state port that conversation is quicker but less formal — it is worth having in writing. Diving permission, terminal approval and any environmental clearance for in-water work are handled by us, not left with the agent to chase.
- 3
Mobilisation to Abidjan
Divers, compressors, brush carts and cameras mobilise via Abidjan (ABJ). Where a vessel is also calling at San Pédro, one mobilisation is normally sized to cover both.
- 4
Safety setup and the dive
The vessel is secured for diving — main engine, shaft and thrusters immobilised, sea suctions confirmed shut, permit agreed with the master. Teams work under surface supervision with continuous diver communications and video throughout.
- 5
Report and handover
A completion report covering UWILD is issued with before-and-after imagery, coating and anode condition and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.
Abidjan Port at a glance
- UN/LOCODE
- CIABJ
- Port type
- State Port
- State
- Abidjan
- Country
- Côte d'Ivoire
- Water body
- Ébrié Lagoon, via the Vridi Canal
- Port authority
- Port Autonome d'Abidjan
- Main cargoes
- Containers, Cocoa and coffee, Crude and refined products, General cargo, Fishing catch
- Crew mobilisation
- Abidjan (ABJ)
- Services here
- Hull Cleaning, Hold Cleaning and Tank Cleaning
Frequently asked — UWILD Inspection at Abidjan
Do you provide UWILD at Abidjan Port?
Yes. Cleanship Marine works Abidjan Port (CIABJ) in Abidjan, Côte d'Ivoire, covering the container terminal berths, oil and general cargo quays, lagoon anchorage. Teams mobilise via Abidjan (ABJ) with the full spread.
Can UWILD be done while the vessel works cargo at Abidjan?
Yes, in most cases. The harbour is sheltered enough that divers work alongside while cargo operations continue, and neither holds the other up. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Abidjan and tell you honestly whether the window you have is enough.
Do you need a diving permit from Port Autonome d'Abidjan?
Yes, and we obtain it. Diving permission from Port Autonome d'Abidjan, terminal approval where the berth requires it, and any environmental clearance for in-water work are arranged as part of the job rather than left with the agent. The master's permit to work and the immobilisation of machinery are agreed on board before anyone enters the water.
What is underwater visibility like at Abidjan?
Visibility at Abidjan Port is moderate, and it drops further around active bulk handling and after heavy rain, and the Atlantic swell and the rains sets the outer limits of the calendar. How the tide and sea state shape the dive plan is set out in full in the working-conditions section on this page.
Which vessels do you carry out UWILD on at Abidjan?
Container ships, Product tankers, General cargo and reefer vessels, Fishing fleet and support craft — the traffic at Abidjan Port runs to containers, cocoa and coffee, crude and refined products, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.
How quickly can a team mobilise to Abidjan?
Divers and equipment mobilise via Abidjan (ABJ). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at San Pédro or Monrovia, one mobilisation is often sized to cover both.
What does UWILD at Abidjan cost?
It depends on the vessel's dimensions and wetted area, the fouling state found, the coating specification and the working window available at Abidjan. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Abidjan and you get a scoped price, usually the same working day.
UWILD at Abidjan Port.
Tell us the vessel, her ETA at Abidjan and the window. You get a scope, a crew size and an honest duration — usually the same working day.


