UWILD at Hamriyah Port
Survey credit earned without leaving the water
Get a quote
Tell us the vessel, the port and the window. Scoped reply, usually the same working day.
Cleanship Marine runs full UWILD programmes — Underwater Inspection In Lieu of Drydocking — at Hamriyah Port, Sharjah, from eligibility discussion through class liaison to the final report package.
UWILD lets a vessel satisfy a survey requirement that would otherwise mean a dry docking, at a fraction of the cost and with none of the off-hire. The requirements are exacting: the contractor must hold class approval, the vessel must be eligible, hull markings must let the surveyor locate features precisely, and the inspection has to be delivered live and documented. Shelter is on your side here — the vessel is stable and the dive is uninterrupted — but basin silt means the lighting and camera plan has to be agreed with the surveyor before the class attendance is booked, not improvised on the day.
What it gets you
- Drydocking deferred and the survey credit earned in the water
- Class liaison handled end to end rather than left with the superintendent
- Eligibility confirmed before cost is committed, not discovered afterwards
- A documented inspection record that stands up to class review
Working conditions at Hamriyah
Hamriyah is a sheltered free-zone port with a heavy offshore and fabrication presence, so alongside work is straightforward and the constraint is usually access and permits rather than weather. Shallow, hot Gulf water grows fouling quickly on the offshore support vessels and barges that spend long periods here between charters — the heaviest growth we lift in the northern emirates is usually off idle tonnage at Hamriyah.
- Where we work
- Free zone berths · Oil and gas quays · Bulk berths · Anchorage
- Vessels we see here
- General cargo and project vessels · Handysize bulk carriers · Offshore support vessels and barges · Product and chemical tankers
What we do at Hamriyah
- Eligibility review against the vessel's age, type, class notation and survey history before anything is booked
- Programme agreed with the class society and the surveyor attending at Hamriyah
- Hull, rudder, propeller, stern gear, sea chests and appendages inspected to the UWILD scope
- Live video, thickness measurement and clearance readings where the programme calls for them
- Diving permission cleared with Sharjah Ports Authority, with the vessel secured and machinery immobilised
- Complete report package submitted for the class file and the drydocking credit
Planning the window at Hamriyah
The shamal governs the calendar at Hamriyah Port, through the winter months and again in early summer. The shamal is a wind and sea-state problem rather than a rain one: it builds short, steep seas across the shallow Gulf that stop anchorage work while berths stay usable. Because the harbour is sheltered, work here normally runs alongside or at a protected anchorage and can proceed in parallel with cargo operations rather than competing with them for the berth window.
Work is taken at the free zone berths, oil and gas quays, bulk berths, anchorage, and which of those a vessel ends up at changes the dive plan more than the season does. Teams mobilise via Sharjah (SHJ) or Dubai (DXB), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.
What we typically find at Hamriyah
Dry bulk handling here puts cargo dust into the water around the berths and anchorage. It settles on horizontal surfaces and packs into sea chest gratings and inlet openings, so inlet and grating clearance is routinely a larger part of the job at Hamriyah than owners budget for.
Shelter is a mixed blessing for a hull. The same calm that makes the port easy to work in is still water, and still water grows fouling faster than an exposed berth does.
Standard scope of work
Included as standard on every UWILD attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.
- Eligibility and planning
- Vessel eligibility, survey scope and the society's specific requirements are established and agreed before mobilisation.
- Hull preparation
- Reference markings and cleaning of inspection areas so structure and features can be located and viewed unambiguously.
- Systematic inspection
- Shell plating, welds, rudder, propeller, sea chests, openings, anodes and appendages inspected to the agreed programme.
- Measurement and NDT
- Clearance measurement and underwater NDT carried out where the survey scope requires it.
- Documentation
- Video, stills, measurements and findings compiled into a report package suitable for submission to the classification society.
How we deliver it at Hamriyah
- 1
Scope and vessel details
Tell us the vessel, her particulars, the coating specification and the window at Hamriyah. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.
- 2
Permits and approvals
Diving permission is obtained from Sharjah Ports Authority, along with terminal approval where the berth requires it and any environmental clearance for in-water work. This is handled by us, not left with the agent to chase.
- 3
Mobilisation to Hamriyah
Divers, compressors, brush carts and cameras mobilise via Sharjah (SHJ) or Dubai (DXB). Where a vessel is also calling at Sharjah, one mobilisation is normally sized to cover both.
- 4
Safety setup and the dive
The vessel is secured for diving — main engine, shaft and thrusters immobilised, sea suctions confirmed shut, permit agreed with the master. Teams work under surface supervision with continuous diver communications and video throughout.
- 5
Report and handover
A completion report covering UWILD is issued with before-and-after imagery, coating and anode condition and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.
Hamriyah Port at a glance
- UN/LOCODE
- AEHAM
- Port type
- State Port
- Emirate
- Sharjah
- Country
- United Arab Emirates
- Water body
- Arabian Gulf
- Port authority
- Sharjah Ports Authority
- Main cargoes
- Steel and project cargo, Oil and gas equipment, Aggregates and dry bulk, Liquid bulk, General cargo
- Crew mobilisation
- Sharjah (SHJ) / Dubai (DXB)
- Services here
- Hull Cleaning, Hold Cleaning and Tank Cleaning
Frequently asked — UWILD Inspection at Hamriyah
Do you provide UWILD at Hamriyah Port?
Yes. Cleanship Marine works Hamriyah Port (AEHAM) in Sharjah, United Arab Emirates, covering the free zone berths, oil and gas quays, bulk berths, anchorage. Teams mobilise via Sharjah (SHJ) or Dubai (DXB) with the full spread.
Can UWILD be done while the vessel works cargo at Hamriyah?
Yes, in most cases. The harbour is sheltered enough that divers work alongside while cargo operations continue, and neither holds the other up. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Hamriyah and tell you honestly whether the window you have is enough.
Do you need a diving permit from Sharjah Ports Authority?
Yes, and we obtain it. Diving permission from Sharjah Ports Authority, terminal approval where the berth requires it, and any environmental clearance for in-water work are arranged as part of the job rather than left with the agent. The master's permit to work and the immobilisation of machinery are agreed on board before anyone enters the water.
What is underwater visibility like at Hamriyah?
Visibility at Hamriyah Port is moderate, and it drops further around active bulk handling and after heavy rain, and the shamal sets the outer limits of the calendar. How the tide and sea state shape the dive plan is set out in full in the working-conditions section on this page.
Which vessels do you carry out UWILD on at Hamriyah?
General cargo and project vessels, Handysize bulk carriers, Offshore support vessels and barges, Product and chemical tankers — the traffic at Hamriyah Port runs to steel and project cargo, oil and gas equipment, aggregates and dry bulk, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.
How quickly can a team mobilise to Hamriyah?
Divers and equipment mobilise via Sharjah (SHJ) or Dubai (DXB). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Sharjah or Ajman, one mobilisation is often sized to cover both.
What does UWILD at Hamriyah cost?
It depends on the vessel's dimensions and wetted area, the fouling state found, the coating specification and the working window available at Hamriyah. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Hamriyah and you get a scoped price, usually the same working day.
UWILD at Hamriyah Port.
Tell us the vessel, her ETA at Hamriyah and the window. You get a scope, a crew size and an honest duration — usually the same working day.


