UWILD at Kpémé Port
Survey credit earned without leaving the water
Get a quote
Tell us the vessel, the port and the window. Scoped reply, usually the same working day.
Cleanship Marine runs full UWILD programmes — Underwater Inspection In Lieu of Drydocking — at Kpémé Port, Maritime Region, from eligibility discussion through class liaison to the final report package.
UWILD lets a vessel satisfy a survey requirement that would otherwise mean a dry docking, at a fraction of the cost and with none of the off-hire. The requirements are exacting: the contractor must hold class approval, the vessel must be eligible, hull markings must let the surveyor locate features precisely, and the inspection has to be delivered live and documented. Survey work at an open anchorage lives and dies on the weather window, so class attendance is booked with a realistic standby allowance rather than a single optimistic date.
What it gets you
- Drydocking deferred and the survey credit earned in the water
- Class liaison handled end to end rather than left with the superintendent
- Eligibility confirmed before cost is committed, not discovered afterwards
- A documented inspection record that stands up to class review
Working conditions at Kpémé
Kpémé loads over an offshore jetty with no enclosed basin, so there is no shelter at all and the Atlantic swell decides whether work happens. Vessels lie exposed for the whole loading operation, which makes this one of the more demanding in-water working environments on the coverage list and one where the window has to be taken when it appears rather than booked. Water is warm and reasonably clear away from the loading point.
- Where we work
- Offshore loading jetty · Outer anchorage
- Vessels we see here
- Handysize and Supramax bulk carriers · Support and mooring craft
What we do at Kpémé
- Eligibility review against the vessel's age, type, class notation and survey history before anything is booked
- Programme agreed with the class society and the surveyor attending at Kpémé
- Hull, rudder, propeller, stern gear, sea chests and appendages inspected to the UWILD scope
- Live video, thickness measurement and clearance readings where the programme calls for them
- Diving permission cleared with Société Nouvelle des Phosphates du Togo, with the vessel secured and machinery immobilised
- Complete report package submitted for the class file and the drydocking credit
Planning the window at Kpémé
The Atlantic swell and the rains governs the calendar at Kpémé Port, with the heaviest rain from May to October and swell running year-round. The swell here is long-period Atlantic ground swell rather than wind-driven sea, so it reaches the anchorages on days that look calm from the bridge and it is the single biggest cause of a lost in-water window on this coast. Work here is done with the vessel riding to her anchor, so the dive plan is built around sea state and swell rather than a berth slot, and the team stands by for a workable window rather than a scheduled one.
Work is taken at the offshore loading jetty and outer anchorage, and which of those a vessel ends up at changes the dive plan more than the season does. Teams mobilise via Lomé (LFW), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.
What we typically find at Kpémé
The working fleet here spends most of its life at low speed in warm water, so growth is heavy, mixed and reaches the hard calcareous stage sooner than on deep-sea tonnage. Left too long it starts damaging the coating rather than just slowing the vessel.
Vessels here sit at anchor for long periods, and a stationary hull in warm water is the ideal fouling substrate. The heaviest growth we lift at this port is almost always off a vessel that has been waiting rather than working.
Standard scope of work
Included as standard on every UWILD attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.
- Eligibility and planning
- Vessel eligibility, survey scope and the society's specific requirements are established and agreed before mobilisation.
- Hull preparation
- Reference markings and cleaning of inspection areas so structure and features can be located and viewed unambiguously.
- Systematic inspection
- Shell plating, welds, rudder, propeller, sea chests, openings, anodes and appendages inspected to the agreed programme.
- Measurement and NDT
- Clearance measurement and underwater NDT carried out where the survey scope requires it.
- Documentation
- Video, stills, measurements and findings compiled into a report package suitable for submission to the classification society.
How we deliver it at Kpémé
- 1
Scope and vessel details
Tell us the vessel, her particulars, the coating specification and the window at Kpémé. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.
- 2
Permits and approvals
Access at Kpémé Port is the terminal operator's decision as much as Société Nouvelle des Phosphates du Togo's, so both are in the approval chain from the start — a berth-side refusal discovered at the gangway costs the whole attendance. Diving permission, terminal approval and any environmental clearance for in-water work are handled by us, not left with the agent to chase.
- 3
Mobilisation to Kpémé
Divers, compressors, brush carts and cameras mobilise via Lomé (LFW). Where a vessel is also calling at Lomé, one mobilisation is normally sized to cover both.
- 4
Safety setup and the dive
The vessel is secured for diving — main engine, shaft and thrusters immobilised, sea suctions confirmed shut, permit agreed with the master. Teams work under surface supervision with continuous diver communications and video throughout.
- 5
Report and handover
A completion report covering UWILD is issued with before-and-after imagery, coating and anode condition and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.
Kpémé Port at a glance
- UN/LOCODE
- TGKPE
- Port type
- Private Port
- State
- Maritime Region
- Country
- Togo
- Water body
- Gulf of Guinea
- Port authority
- Société Nouvelle des Phosphates du Togo
- Main cargoes
- Phosphate rock
- Crew mobilisation
- Lomé (LFW)
- Services here
- Hull Cleaning
Frequently asked — UWILD Inspection at Kpémé
Do you provide UWILD at Kpémé Port?
Yes. Cleanship Marine works Kpémé Port (TGKPE) in Maritime Region, Togo, covering the offshore loading jetty and outer anchorage. Teams mobilise via Lomé (LFW) with the full spread.
Can UWILD be done while the vessel works cargo at Kpémé?
Yes — it is the norm here, because the work is done at anchor rather than at a berth. Barge operations carry on around the dive, with the working side agreed with the master beforehand. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Kpémé and tell you honestly whether the window you have is enough.
Do you need a diving permit from Société Nouvelle des Phosphates du Togo?
Yes, and we obtain it. Diving permission from Société Nouvelle des Phosphates du Togo, terminal approval where the berth requires it, and any environmental clearance for in-water work are arranged as part of the job rather than left with the agent. The master's permit to work and the immobilisation of machinery are agreed on board before anyone enters the water.
What is underwater visibility like at Kpémé?
Visibility at Kpémé Port is generally workable outside the monsoon, though cargo dust from lighterage reduces it sharply near an active transfer, and the Atlantic swell and the rains sets the outer limits of the calendar. How the tide and sea state shape the dive plan is set out in full in the working-conditions section on this page.
Which vessels do you carry out UWILD on at Kpémé?
Handysize and Supramax bulk carriers, Support and mooring craft — the traffic at Kpémé Port runs to phosphate rock, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.
How quickly can a team mobilise to Kpémé?
Divers and equipment mobilise via Lomé (LFW). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Lomé or Cotonou, one mobilisation is often sized to cover both.
What does UWILD at Kpémé cost?
It depends on the vessel's dimensions and wetted area, the fouling state found, the coating specification and the working window available at Kpémé. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Kpémé and you get a scoped price, usually the same working day.
UWILD at Kpémé Port.
Tell us the vessel, her ETA at Kpémé and the window. You get a scope, a crew size and an honest duration — usually the same working day.


