Yanbu Port · SAYBI

Tank Demucking at Yanbu Port

Sludge out, capacity back

Get a quote

Tell us the vessel, the port and the window. Scoped reply, usually the same working day.

Or call the 24/7 desk on +91 92365 20609

Cleanship Marine removes accumulated sludge, scale and sediment from cargo and bunker tanks at Yanbu Port, Al Madinah Province — the manual, enclosed-space work that washing alone will not do.

Sludge is a slow loss: it takes cargo capacity, it fouls heating coils and suctions, and it turns every subsequent tank clean into a longer job. Disposal is the part that actually governs the schedule here — the muck has to go somewhere licensed, and that is arranged before the tanks are opened.

What it gets you

  • Cargo and bunker capacity recovered rather than carried as dead weight
  • Heating coils and suctions cleared, restoring discharge performance
  • Disposal documented through licensed reception
  • Tank structure inspected while it is open and empty

Working conditions at Yanbu

Work here starts alongside, and where the berth window runs out it continues on the outward passage with a riding crew — the berth will not be held open for it. The northerly Red Sea wind sets the outer limits of the calendar, strongest through the winter and spring, and it affects the anchorage far more than the berth. Heat and humidity are the harder constraint. The Red Sea is among the warmest and most saline bodies of water the fleet trades in — which grows fouling faster than the Gulf does — and between June and September enclosed-space work runs to shortened cycles with enforced rest and forced ventilation. Approval runs through Mawani and the Royal Commission for Yanbu and the terminal operator, and licensed slop reception is booked before the tanks are opened — at most ports on this list that booking, not the cleaning, is what sets the date.

Where we work
Crude loading berths · Product jetties · Sulphur berth
Vessels we see here
VLCC and Suezmax crude tankers · Product and chemical tankers · LPG carriers · Bulk carriers

What we do at Yanbu

  • Atmosphere testing, gas-freeing and enclosed-space entry certification before entry
  • Manual removal of sludge, scale and sediment from tank bottoms, frames and structure
  • Heating coils, suction wells and bell mouths cleared and confirmed
  • Material bagged, transferred and tracked from tank to reception
  • Disposal through licensed reception facilities at Yanbu with the paperwork to prove it
  • Tank condition photographed and reported, including anything found under the sludge

Planning the window at Yanbu

The northerly Red Sea wind governs the calendar at Yanbu Port, strongest through the winter and spring. For tank work it is the anchorage that suffers — where the terminal will not permit work alongside, weather that closes the anchorage closes the job. Terminal windows here are tight and most operators will not permit tank work alongside, so the realistic plan is the anchorage or the outward passage. That is agreed before the vessel arrives, not argued at the berth.

Teams mobilise via Yanbu (YNB) or Jeddah (JED), so give us the ETA as early as you have it — the travel is the flexible part, the approvals and the working window are not.

What we typically find at Yanbu

Gas and specialised liquid tonnage calls here, which puts the certification chain ahead of the cleaning itself: gas-freeing, marine chemist attendance and enclosed-space entry certificates are the critical path, and the physical work is the short part of the job.

Tanks here are usually presented with a machine wash already done and the hand work outstanding — bottom structure, suction wells, heating coils and the areas the machines cannot reach. That remainder is what a wall wash actually fails on.

Standard scope of work

Included as standard on every tank demucking attendance, wherever the vessel is. Anything outside it is quoted separately and flagged before mobilisation, never added afterwards.

Tank entry preparation
Ventilation, gas testing, lighting, access rigging and rescue arrangements are established before any entry is authorised.
Manual residue removal
Sludge, wax and scale are removed by hand from tank bottoms, suction wells, bellmouths, heating coils and structural pockets.
Vacuum and pump-out
Pumpable residues are recovered by vacuum unit or portable pump directly to slop tanks, road tankers or barges.
Scale and hard deposit removal
Adhered rust scale and hardened deposits are removed by scraping, chipping or hydroblasting where the coating system permits.
Waste handling and documentation
Recovered material is quantified, transferred to licensed reception facilities and documented with manifests for the vessel's MARPOL records.

How we deliver it at Yanbu

  1. 1

    Scope and vessel details

    Tell us the vessel, her particulars, the prior and next grade and the window at Yanbu. We come back with a defined scope, a crew size and a duration we will stand behind. Where the conditions here will not support what has been asked for, we say so at this stage rather than after mobilisation.

  2. 2

    Approvals, slops and certification

    Access at Yanbu Port is the terminal operator's decision as much as Mawani and the Royal Commission for Yanbu's, so both are in the approval chain from the start — a berth-side refusal discovered at the gangway costs the whole attendance. Licensed slop and sludge reception is booked and marine chemist attendance arranged where the grade change requires it. At Yanbu the disposal route is the item that most often sets the schedule, so it is fixed first.

  3. 3

    Mobilisation to Yanbu

    Crews, pumps, machines and chemicals mobilise via Yanbu (YNB) or Jeddah (JED). Where a vessel is also calling at Jeddah, one mobilisation is normally sized to cover both.

  4. 4

    Gas-freeing, entry and cleaning

    Atmosphere testing, gas-freeing and enclosed-space entry certification come before any entry, and are repeated after every break. Standby cover and atmosphere monitoring run continuously while anyone is inside, and progress is reported tank by tank.

  5. 5

    Report and handover

    A completion report covering tank demucking is issued with before-and-after imagery, tank by tank and anything found that you should know about. The findings are discussed with the vessel rather than emailed and forgotten.

Yanbu Port at a glance

UN/LOCODE
SAYBI
Port type
Private Port
State
Al Madinah Province
Country
Saudi Arabia
Water body
Red Sea
Port authority
Mawani and the Royal Commission for Yanbu
Main cargoes
Crude oil, Refined products, Petrochemicals, LPG, Sulphur
Crew mobilisation
Yanbu (YNB) / Jeddah (JED)
Services here
Hull Cleaning, Hold Cleaning and Tank Cleaning

Frequently asked — Tank Demucking at Yanbu

Do you provide tank demucking at Yanbu Port?

Yes. Cleanship Marine works Yanbu Port (SAYBI) in Al Madinah Province, Saudi Arabia, covering the crude loading berths, product jetties and sulphur berth. Teams mobilise via Yanbu (YNB) or Jeddah (JED) with the full spread.

Can tank demucking be done while the vessel works cargo at Yanbu?

Most terminals here will not permit tank work alongside, so the plan is the anchorage or the outward passage. We confirm the terminal's position before quoting rather than discovering it at the gangway. The vessel stays on hire throughout, and there is no diversion and no dry dock. We scope against the conditions at Yanbu and tell you honestly whether the window you have is enough.

How is slop and sludge disposal handled at Yanbu?

Through licensed reception, booked with Mawani and the Royal Commission for Yanbu and the terminal operator before the tanks are opened. At Yanbu the disposal route is usually what sets the schedule, so it is fixed first and documented tank by tank. Gas-freeing, atmosphere testing and enclosed-space entry certification are part of the same scope.

Where is the work done at Yanbu — alongside, at anchorage or on passage?

Work here starts alongside, and where the berth window runs out it continues on the outward passage with a riding crew — the berth will not be held open for it. Between June and September the binding constraint is working temperature inside the space rather than access to it.

Which vessels do you carry out tank demucking on at Yanbu?

VLCC and Suezmax crude tankers, Product and chemical tankers, LPG carriers, Bulk carriers — the traffic at Yanbu Port runs to crude oil, refined products and petrochemicals, so those are the profiles we see most. The scope is sized to the vessel, not to a standard package.

How quickly can a team mobilise to Yanbu?

Crews and equipment mobilise via Yanbu (YNB) or Jeddah (JED). Give us the ETA and the window and we will confirm what is achievable rather than promise a date we cannot hold. Where the vessel also calls at Jubail, one mobilisation is often sized to cover both.

What does tank demucking at Yanbu cost?

It depends on the tank count and volume, the prior and next grade, how much sludge is in there and whether the work runs alongside, at anchorage or on passage from Yanbu. We would rather scope it properly and give you a specific figure than quote a headline rate that changes once the work starts. Send the details and the window at Yanbu and you get a scoped price, usually the same working day.